![GSL electronics BMPPT-150 Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/gsl-electronics/bmppt-150/bmppt-150_operating-instructions-manual_2275294007.webp)
Page 7 of 8
Model:
BMPPT-150
Unit 2, 110 Station Road, Seven Hills ,NSW, 2147, Australia
150W Solar Charger
Booster Maximum Power Point Tracker
Operating Instructions
Please read these instructions before use
Wiring The Remote Alarm:
The remote alarm is a normally low, 5V digital signal that goes high when the battery voltage drops below
0.9 of nominal voltage, the LVD disconnects or over temperature trips. It has a 5mA source capability and
can be used to remotely monitor system status.
Wiring With Load Remote Control:
This option enables the remote load connection and disconnection via the load remote control,
yellow wire. When the yellow wire is grounded the load is disconnected otherwise the load is
connected. To configure this mode the green wire must be grounded. This option overrides the LVD
or DDS function but has the same load limitations of 10A continuous or 20A transient.
Grey
LOAD
Green
Yellow
BMPPT-150-R4
Buzzer, LED
PC I/O 5V 5mA
+
-
Blue
Black
Please ensure that your BMPPT has been correctly configured (REN & CHE settings) for
your application. Refer to the Settings and Configurations section for more information.