9. Assembly
72
PNEG-1510
Top Dry 24', 30' and 36' Manual Batch
Optional Rotary Switch Roof Locations
Figure 9W Overhead View of Optional Rotary Switch Locations
Optional Rotary Switch Panel Locations
Drill 2" diameter holes through roof panels at locations as shown
. Use a mounting plate as
a pattern and drill four (4) 3/8" holes through roof panels at each switch location so the plate can be bolted
to the roof.
Figure 9X
Top Dry Bin
Diameter
“A”
24'
23-1/2"
30" and 36"
19"
Содержание Top Dry 24
Страница 1: ...PNEG 1510 Top Dry 24 30 and 36 Manual Batch Construction and Owner s Manual PNEG 1510 Date 02 18 13 ...
Страница 2: ...2 PNEG 1510 Top Dry 24 30 and 36 Manual Batch ...
Страница 30: ...6 Stiffener Details 30 PNEG 1510 Top Dry 24 30 and 36 Manual Batch Outside Stiffeners Continued Figure 6A ...
Страница 34: ...6 Stiffener Details 34 PNEG 1510 Top Dry 24 30 and 36 Manual Batch Stiffener and Seam Locations Figure 6E ...
Страница 78: ...10 Accessories 78 PNEG 1510 Top Dry 24 30 and 36 Manual Batch 2 Ring Door Assembly Figure 10B ...
Страница 80: ...10 Accessories 80 PNEG 1510 Top Dry 24 30 and 36 Manual Batch Optional Bin Step Assembly WD 042 Figure 10C ...
Страница 82: ...82 PNEG 1510 Top Dry 24 30 and 36 Manual Batch NOTES ...