![GSi PNEG-902 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/gsi/pneg-902/pneg-902_installation-manual_2275003010.webp)
10
PNEG-902
Multi - Module Dryer Stacking
3. Module Preparation and Installation
Setting Lower Module on Pedestals
1. Install stiffeners and service platform in
accordance with PNEG-349REV. At each
stiffener/pedestal location, remove the 1/2" bolts
and nuts that attach the dryer frame leg to the
frame rail. Use that hardware to attach a stiffener
base connector clip (D01-1045).
and
Figure 3C
2. Lift base module and position it in the location the
dryer is to occupy.
NOTE
:
Crane brackets may
need to be adjusted to ensure that the module will
be parallel to the
ground when lifted.
With the base
module in position, bolt a pedestal to each stiffener
base connector clip using 3/8"-16 x 1-1/2" bolts
(S-7928).
Figure 3D
Figure 3E
3. With a stiffener splice (SS-7053), splice the
pedestal to stiffener at each pedestal location.
Make sure all nuts and bolts used so far have
been tightened.
Figure 3F
Personnel working around this equipment while it is lifted into position must
use extreme caution.
Lifting equipment (crane and rigging) must be of proper lifting capability for the
unit size and weight. All local safety precautions and procedures
must be followed.
Stiffener
D01-1045
Stiffener base
connecter clip
Pedestal
Stiffener
splice
Stiffener
When splicing pedestal to
stiffener use 3/8"-16 x 1-1/2"
bolts (S-7928) where circled
in
. Use 3/8"-16 x 1"
(S-7927) in all other holes.
Содержание PNEG-902
Страница 2: ...2 PNEG 902 Multi Module Dryer Stacking...