
4. Installation
PNEG-1894
TopDry Chute Controller
15
Attaching the Mounting Plate and Gussets to the Stiffener
1. Position the bottom edge of the stiffener mounting plate 13" from the bottom of the stiffener.
2. Field drill all six (6) holes in the stiffener using the mounting plate as a template for hole locations,
making sure that the holes are drilled on the peaks of corrugation ridge.
3. Attach the stiffener mounting plate (A) using six (6) bolts (B) and nuts (C).
Figure 4D
Ref #
Part #
Description
A
TD-101327
Stiffener Mounting Plate
B
S-10275
Bolt, HHCS 3/8"-16 x 1-1/2" YDP Grade 8 or Grade 8.2
C
S-7383
Nylock Nut 3/8"-16 Zinc Grade 5
Содержание PNEG-1894
Страница 1: ...PNEG 1894 TopDry Chute Controller Installation Manual PNEG 1894 Version 5 1 Date 09 27 20...
Страница 12: ...12 PNEG 1894 TopDry Chute Controller 3 Controller Layout Figure 3A Chute Pulley Cable Location...
Страница 14: ...4 Installation 14 PNEG 1894 TopDry Chute Controller Figure 4C...
Страница 23: ...PNEG 1894 TopDry Chute Controller 23 5 Wiring and Schematic Diagrams Actuator Wiring Schematic...