10. Service
PNEG-1707
TM-Series Tower Dryer
57
Pre-season Service Check List
___ Lubricate blower motor bearings, if needed.
___ Clean burner ports.
___ Inspect flame rod and spark ignitor.
___ Inspect divider hopper between heat and cooling section. Clean if necessary.
___ Inspect bindicator grain level switches.
___ Check gas pressure gauges.
___ Clean control and power panels, tighten loose connections, and check for leaks.
___ Inspect metering systems. Clean accumulated stalks and old grain.
___ Start-up dryer and check operating controls.
___ Other: Itemize ___________________________________________________________
End of Season Shut Down Procedure
___ Start unload and empty all grain from dryers.
___ Clean out grain cushion (on plenum roof under fill spout). Clean plenum roof.
___ Clean off grain exchangers.
___ Clean out divider hopper, between heating and cooling section.
___ Clean inside cooling sheets and cooling floor.
___ Remove all grain and trash from unload section of dryer.
___ Open emergency grain discharge doors.
___ Open drain valve in gas train.
___ Cover burner with a tarp or plastic sheeting.
Lubrication Table
Location
Instructions
Type of
Lubrication
Lubrication Interval
Accutrol (sweep unload)
bottom shaft bearing.
Lubricate slowly until lube
shows through seal.
Wipe clean.
High quality, grade #2
lithium based grease.
Beginning of season (annually).
Blower motor bearings.
See motor lubrication
procedure
High quality, grade #2
lithium based grease.
Every 2 years (Normal
operation, ever 8-10 months
continuous operation).
Metering variable speed
drive motor.
See motor lubrication
procedure
High quality, grade #2
lithium based grease.
Every 2 years (Normal
operation, ever 8-10 months
continuous operation).
Accutrol sweep gearbox.
Grease filled gearbox.
Additional grease does not need
to be added.
¹Lubrication of motors
- Operate motor for 20 minutes. Clean grease fitting. Remove grease relief plug and using a
low pressure grease gun, pump in the required grease. After re-lubricating, allow motor to run for 10 minutes before replac-
ing relief hardware.
DO NOT over grease
.
Содержание PNEG-1707
Страница 1: ...TM Series Tower Dryer Operation Manual PNEG 1707 Version 2 1 Date 09 22 20 PNEG 1707...
Страница 21: ...4 Dryer Installation PNEG 1707 TM Series Tower Dryer 21 Modular Base Layout Figure 4A...
Страница 22: ...4 Dryer Installation 22 PNEG 1707 TM Series Tower Dryer Central United States Foundation Plan Figure 4B...
Страница 23: ...4 Dryer Installation PNEG 1707 TM Series Tower Dryer 23 Northern United States Foundation Plan Figure 4C...