![GSI Group PNEG-1049 Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/gsi-group/pneg-1049/pneg-1049_assembly-and-operation-manual_2275205034.webp)
6. Operation
34
PNEG-1049
10"-12" Commercial Bin Sweep Augers
20. The bin sweep will clear most of the remaining grain in one pass. A second pass will clean out
additional grain, before final clean out.
21. After the bin sweep has made two (2) passes removing most of the grain, it will be necessary to clean
the floor.
NOTE:
The bin sweep is composed of several sections of flight and back shields. The bin can be
emptied using just the discharge section of flight and back shield and attaching the wheel
assembly to the free end. After the center of the bin has been swept, the next section of light
and back shield can be attached to the discharge section, with the wheel assembly at the end
of the second section. After the bin has been swept with two (2) sections more the process
can be repeated until the bin is completely empty.
Figure 6H
Figure 6I
DO NOT enter a grain bin unless all power driven equipment has been shut down
and locked out.
Содержание PNEG-1049
Страница 40: ...40 PNEG 1049 10 12 Commercial Bin Sweep Augers NOTES...
Страница 42: ...8 Parts List 42 PNEG 1049 10 12 Commercial Bin Sweep Augers Motor Rods to Drive...
Страница 44: ...8 Parts List 44 PNEG 1049 10 12 Commercial Bin Sweep Augers 10 12 Drive Assembly...
Страница 46: ...8 Parts List 46 PNEG 1049 10 12 Commercial Bin Sweep Augers 3 1 Aluminum Enclosed Drive...
Страница 54: ...54 PNEG 1049 10 12 Commercial Bin Sweep Augers NOTES...