![GSI Group PNEG-1020 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/gsi-group/pneg-1020/pneg-1020_installation-and-operation-manual_2275180015.webp)
PNEG-1020 Bin Sweep Auger
15
6" and 8" Bin Sweep Assembly & Installation
5. Place the outer lock collar onto the shaft.
This lock collar will be located on the
opposite side of the motor mount
assembly as the first one. Do not tighten
the collar.
Figure 4.1-E
4.2 Install the Pulley
1. Place the pulley onto the shaft making
sure that the stub of the pulley is facing
inward toward the motor mount
assembly.
Figure 4.2-A
2. Turn the pulley wheel so that the roll pin
hole on the pulley shaft and the roll pin
hole on the tube align.
Figure 4.2-B
3. Insert a 5/16" x 2" roll pin into pin hole
located on the pulley stub. Drive the roll
pin, with a hammer and a punch, equally
through both sides of pulley.
Note: It may be necessary to pre-start the
roll pin. The pulley is separate from
the shaft as seen in
corner picture.
Figure 4.2-C
Collar
Pulley with stub
facing inward
Pin Hole
5/16" x 2"
Roll Pin