G20 Engineering srl estabilished in Loc. Campogrande, 13 - Carpaneto Piacentino whose processes of design, 
manufacturing and after-sales service are in compliance with requirements of UNI EN ISO 9001:2008 - DECLARES 
that  THEA  boilers  are  in  compliance  with  European  Directives  and  with  European  Delegates  regulations.                                                                                                                                     
                                

 Chief Executive   Marco Rapaccioli

TABLE OF CONTENTS 

General requirements 

 

2

-General information 

 

2

-Description of the boiler 

 

3

-Components 

  3

-Interface description         

4

-Main 

menu 

  5

-Page 2-Operation 

 

6

-Page 2-Operation-Season select 

7

-Page 2-Operation-Temperature  

regulation 

  7

-Information menu 

 

-Operation with room 

 thermostat 

 

  

9

-Operation with external sensor 

9

-Operation with 

 Opentherm  timer thermostat 

9

-Operation with storage tank 

10

-Faults 

   12

-Fault codes table 

 

13

Installation 

  14

-Operational diagram 

 

14

-Cascade installation diagram 

14

-Wiring 

diagram 

  15

-Installation 

  16

-Fastening the boiler to the wall 

17

-Layout of connections 

 

17

-Plumbing in the boiler 

 

18

-Connecting the condensate line 

18

-Connection to the mains 

 gas supply 

 

 

19

-Connection to the electrical system  20

-Combustion gas evacuation system  21 

-Air intake and combustion gas  

evacuation system: important  

information 

 

     

21

Adjustment and maintenance  

22

-General maintenance operations    22

-Component replacement   

23

-Cleaning the Mixer filter 

   

24

-Power adjustment 

   

26

-Testing the gas supply 

 dynamic pressure  

   

27

-Heating power adjustament 

28

-Analysis - Checking and regulating  

combustion 

 

  29

-Changing gas type 

 

30

-Accessing the configuration menu 

31

-Installer menu     

 

32

-Thermostat installation   

 

34

-Installation of external temp. sensor  35

-External temp. sensor conf.   

35

-Auto-learning function 

 

36

-Configuring the climate curve   

37

-High-temp systems (SP50°-80°)   

37

-Low temp systems (SP28°-57°)   

37

-Timer thermostat installation   

37

-Special functions 

 

38

-Technical Data   

   

39

EC CONFORMITY DECLARATION (ACCORDING TO ISO/IEC 17050-1)

TABLE OF CONTENTS 

GENERAL INFORMATION

GENERAL REQUIREMENTS

This manual, supplied with every boiler, should be considered 

as an integral component as it contains instructions for 

the correct, safe and appropriate installation, use and 

maintenance of the system.

The manual must always be kept by the user of the boiler 

and made available for the installation and/or maintenance 

technicians to consult. It must also accompany the boiler if it 

should be moved or otherwise transferred.

The manufacturer shall not be held responsible for any 

damage caused by failure to follow the instructions contained 

in this manual, nor:

If the boiler is used for purposes other than those for which 

it was built.

If any part or circuit of the boiler is modified.

If accessories or kits not approved by the manufacturer 

are installed.

If ordinary and extraordinary maintenance is not performed 

by qualified personnel.

If applicable technical and legal requirements have not been 

observed during installation and maintenance of the boiler.

WARNING!

If the boiler should cease to function or not function correctly, 

deactivate it immediately by turning it off and then shutting 

off the gas supply. Do not attempt any repairs or direct work 

on the boiler.

Only personnel with the necessary qualifications and licenses 

must perform maintenance on the boiler. Any repairs must be 

performed using only original parts and accessories.

SYMBOLS USED IN THE MANUAL:

Advice, suggestion, note

Important information, indications of methods 

and operations which could compromise 

correct operation of the boiler and create 

a hazard.

CE CERTIFICATES ARE AVAILABLE ON OUR WEBSITE www.produzionecaldaie.it

Содержание Thea 65 MN Kondens

Страница 1: ...ITALIAN DESIGN INSTALLATION COMMISSIONING USE AND MAINTENANCE MANUAL Wall mounted condensing boiler Kondens A brand by G20 ENGINEERING...

Страница 2: ......

Страница 3: ...THEA 65 MN KONDENS MANUAL 08 2017 VERSION REV 2...

Страница 4: ...e climate curve 37 High temp systems SP50 80 37 Low temp systems SP28 57 37 Timer thermostat installation 37 Special functions 38 Technical Data 39 EC CONFORMITY DECLARATION ACCORDING TO ISO IEC 17050...

Страница 5: ...PCB with microprocessor to manage the system in such a way as to always provide maximum efficiency and minimum waste The highest quality components complete a system which is essential whenever the hi...

Страница 6: ...the power was turned off The interface allowing all operating parameters to be selected and modified as well as their relative values to be displayed is extremely simple It is composed of a large bac...

Страница 7: ...essure is displayed in boilers with pressure transmitter and the MAIN MENU can be entered by pressing button 1 to go back to the starting page STAND BY press button 1 again Pict 4 2 By pressing button...

Страница 8: ...off menu access symbol Pict 5 1 When the burner is operating the flame signal is displayed with the radiator symbol flashing Pict 5 2 Based on whether devices such as the pressure sensor external tem...

Страница 9: ...ting only boilers Central heating temperature setting in the CH circuit Push one of the two buttons located above the RADIATOR symbol 7 8 the set and displayed CH water temperature value starts flashi...

Страница 10: ...o access the INFORMATION MENU both when the boiler is in standby off and in operation Selecting the menu pages In order to display all the parameter values of INFORMATION MENU after activating the fir...

Страница 11: ...limate curves can be selected by modifying the correct parameters allowing the boiler to be optimised for a specific climatic area or season It is possible in any case to customise the central heating...

Страница 12: ...ed 3 WAYS DIVERTING VALVE CONNECTION The correct system operation depends on the correct diverting valve functioning Therefore the correct functioning of the hydraulic connections must be carefully ch...

Страница 13: ...control devices have to be connected In order to activate the DHW option with storage the parameter A0 1 must be set from the installer menu After the DHW option has been activated the NTC sensor ther...

Страница 14: ...yed immediately consisting of a number preceded by the error symbol E and by the relevant fault symbol Pict 11 Faults are displayed on any screen of the main menu Conditions causing transitory faults...

Страница 15: ...Boiler locked Reset the system Power off the system Replace electronic board E14 Fan speed fault Boiler locked Check fan connections Replace fan E16 Exhaust temperature sensor Boiler locked Check syst...

Страница 16: ...it 11 Expansion tank COMBINATION DOMESTIC HOT WATER CENTRAL HEATING 7 6 10 2 3 1 RITORNO RISCALDAMENTO INGRESSO ACQUA MANDATA RISCALDAMENTO GAS SCARICO CONDENSA 4 P P BT 1 2 3 5 4 6 A CASCADE INSTALLA...

Страница 17: ...H2O PRESS jumper COMBUSTION GAS SENSOR LIVE NEUTRAL EARTH OPEN THERM ROOM THERM EXTERNAL SENSOR PUMP NEUTRAL PUMP LIVE NEUTRAL LIVE FAN LIVE FAN NEUTRAL GAS VALVE BOILER EARTH 24Vdc Feedback Hall Sen...

Страница 18: ...ry caused by improper use Using the boiler according to its design also means respecting the instructions given in the operation and maintenance manuals and observing the general inspection and mainte...

Страница 19: ...le bit to drill the holes indicated by the two wall plug symbols on the template Insert two hooks into the holes and fasten the metal sheet template to the wall then hang the boiler 800 MURO WALL 105...

Страница 20: ...Do not use the plumbing pipework connections as earth points for electrical equipment WARNING PROTECT THE PRIMARY HEAT EXCHANGER BY THE USE OF THE CORROSION INHIBITOR FLUID EXCLUSIVELY SUPPLIED BY THE...

Страница 21: ...the simultaneous use of all equipment connected to it Check that there is no significant drop in pressure along the distribution line from the gas meter pipes of sufficient diameter must therefore be...

Страница 22: ...rews turn the instruments panel to the open position Cut power to the boiler using the power switch installed before it Remove the lower cover by removing the four screws turn the instrument panel to...

Страница 23: ...RATURES WHENEVER NECESSARY PLACE APPROPRIATE CONDENSATE TRAPS ON THE FLUE EVACUATION LINE Ensure the following before commissioning the boiler THAT THE FLUE EVACUATION AND AIR INTAKE LINES ARE PERFECT...

Страница 24: ...mpliance with all applicable legislation and regulations The boiler should be inspected by a qualified technician at the end of every heating season winter and whenever else it is considered necessary...

Страница 25: ...an power wires and the gas valve power wires 6 Remove the fan as described in FAN section 7 Loosen the two knobs without unscrewing them completely and by pressing them down unhook the spring system f...

Страница 26: ...o access the installer MENU and activate the relative modes from the dedicated page Refer to the procedures indicated in the relative chapter to access the INSTALLER MENU Page 32 After accessing the I...

Страница 27: ...ECT INSTALLATION AND COMMISSIONING OF THE BOILER HAVE BEEN OBSERVED If the function remains activated for long periods of time an increase in pressure may occur in correspondence with the system s ter...

Страница 28: ...utside the building as well as inside the device where applicable is tested for tightness That the gas line meets all applicable legislation and regulations in particular That a gas shut off valve is...

Страница 29: ...ic mains supply pressure Check that the value measured with the manometer falls within the max min interval given in the Dynamic mains supply pressure table for the specific type of gas Whenever dynam...

Страница 30: ...0 3400 3600 3800 4000 4200 4400 4600 4800 5000 5200 5400 5600 5800 6000 6200 6400 6600 6800 7000 7200 7400 7600 7800 8000 n giri ventilatore rpm 10 15 20 25 30 35 40 45 50 55 60 65 70 Potenza kW Thea...

Страница 31: ...POWER Use the SERVICE function to bring the boiler to maximum power Insert the combustion analyser probe in the inspection outlet provided in the flue pict 27 After the boiler has been running for 2 3...

Страница 32: ...E GAS VALVE AFTER REMOVING THE OLD LABEL CHANGING FROM LPG TO NG CONFIGURING THE SOFTWARE REGULATING COMBUSTION APPLY LABEL B2 ON THE GAS VALVE AFTER REMOVING THE OLD LABEL CONFIGURING THE SOFTWARE FO...

Страница 33: ...f any parameter it is necessary to activate Edit mode by entering the correct security code which corresponds to the value of menu parameter P10 Pict 30 Selecting the menu parameter modification page...

Страница 34: ...n power with LPG supply 0 99 N P P2 Burner maximum power 0 99 99 P3 Post circulation time sec 0 99 60 P4 Post ventilation time sec 0 99 10 P5 Anti frequent ignition parameter min 0 255 0 P6 Service fu...

Страница 35: ...Low temperature 1 A4 Minimum fan RPM with NG RPM 100 if A1 0 10 40 17 A5 Minimum fan RPM with LPG RPM 100 if A1 1 10 40 20 A6 Maximum fan RPM with NG RPM 100 if A1 0 Val A4 70 70 A7 Maximum fan RPM wi...

Страница 36: ...as follows Remove the lower cover by removing the four screws turn the instrument panel to the open position Remove the rear instrument panel cover by unscrewing the 4 screws Identify the two pole te...

Страница 37: ...r respective slots Pict 33 Run the cable and hold it in position with the cable grip at the edge of the case Position the cable running it under the cable gripping tabs on the side of the case Close t...

Страница 38: ...ch can be generated using the parameter P7 settings concern the regulation of devices configured to run with high central heating circuit temperatures min set 50 C max set 80 C The value of the parame...

Страница 39: ...urve 3 A in the same conditions will lead to the central heating circuit temperature being set to 47 C point 5 INSTALLATION OF ECOCHRONO OPEN THERM TIMER THERMOSTAT For optimum and even more economica...

Страница 40: ...and the burner lit at minimum power Whenthetemperaturemeasuredbythesensor reaches 8 C the function is deactivated by turning off the burner and restoring the previous conditions When an external senso...

Страница 41: ...5 Efficiency 50 30 105 7 Efficiency 50 30 30 P 113 35 Combustion gas T G20 20mbar amb T 20 C 80 3 Fuel consumption G20 m3 h 6 3 G31 kg h 4 8 HEATING CH water temperature adjustment range C 27 80 Max...

Страница 42: ......

Страница 43: ......

Страница 44: ...MADE IN ITALY G20 ENGINEERING SRL Loc Campogrande 13 29013 CARPANETO PIACENTINO PC Italy phone 39 0523 850513 fax 39 0523 850712 www aircontrol pc com www g20engineering com A brand by G20 ENGINEERING...

Отзывы: