![Grundig GSS SID 162 A Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/grundig/gss-sid-162-a/gss-sid-162-a_assembly-instruction-manual_2272535007.webp)
- 7 -
SID 162 A
4
i
nstalling
the
sat if
input
distributor
Before installing or changing a module or accessory, switch off the head-end
station or unplug the power cable from the mains power socket.
Installing the SAT IF input distributor take care that no cables are squeezed off
or injured.
• Remove the front cover – and if present – the bottom plate of the head-end
station.
• Mount the SAT IF input distributor in the respective bushings. Therefore ob-
serve the assembly instructions of the corresponding head-end station.
• Insert the SAT IF input distributor so into the head-end station that the
LNB power connection
A
is facing the control panel and no cables are
squeezed off or injured.
• Fasten the outer sockets of the SAT IF input distributor
G
with nuts and lock
washers put under each.
G
G
A
Tighten the nuts until the teeth on the lock washers have penetrated the exte-
rior coating and a good connection is made between the housing and the SAT
IF input distributor.
Содержание GSS SID 162 A
Страница 1: ...Assembly Instruction SID 162 A ...