9
English (US)
6.2 Torque values
All nuts and screws used for the installation must be made of
stainless steel.
Use grease (Alu-paste) together with a spring washer or lock nut;
otherwise, use Loctite or a similar product for lubrication and
locking.
All stainless-steel nuts and screws should be tightened to the
following torquevalues:
When mounting the hub/propeller, use lock washer (pos. 1107),
and tighten the two shaft nuts (pos. 1106) to a torque of
37 lbf.ft (50 Nm). See fig. 5.
Fig. 5
Shaft nuts on propeller shaft
6.3 Installation instructions
See section 6.2 Torque values and fig. 4.
1. Weld the connection flange to the cast-in pipe end in the tank.
2. Weld the profile section to the connection flange and pipe end.
Place it in position 12 o'clock.
Fig. 6
Profile section on connection flange
3. SRP.xx.32.xx: Weld the guide claws to the connection flange.
See fig. 7.
Fig. 7
Position of guide claws
4. Drill the holes for the mounting screws for the top mounting
bracket in the concrete.
5. Mount the screws and fit the top mounting bracket.
6. Depending on the length of the guide rail, weld the turnable
part of an intermediate mounting bracke (pos.19, fig. 4) to the
guide rail.
Fig. 8
Top mounting
7. Position and align the guide rail with the profile section on the
connection flange. Shorten the column profile (pos. 2) to the
correct length to match the position of epoxy insulator (pos. C)
at the top mounting bracket. A gap of 0.2 to 0.4 in (5 to 10 mm)
between collar of epoxy and guide rail is optimal.
See fig. 8.
8. Remove the epoxy insulator and the turnable metal part by
removing the center screw (pos. A) and the two mounting
screws (pos. B).
9. Adapt the outside of the square epoxy insulator to the inside of
the guide rail. The epoxy insulator must fit tightly inside the
guide rail.
10.Place the guide rail on the profile section on the connection
flange and mount the top end with the epoxy insulator and the
turnable metal part on the already installed top mounting
bracket. Tighten the three screws (pos. A) and (pos. B) in the
desired position.
11.Fit an intermediate mounting bracket to the turnable part
welded on to the profile tube in step 6. Drill holes in the tank
wall, fit screws in the bracket and tightening the screws.
12.Drill the holes for the mounting screws for the crane foot in the
concrete.
13.Mount the crane foot and fit and tighten the screws.
Screws F-Class 70
[lbf.ft (Nm)]
Screws F-Class 80
[lbf.ft (Nm)]
M6
6.5 (8.8)
8.7 (11.8)
M8
15.8 (21.4)
21.2 (28.7)
M10
32.5 (44)
42.8 (58)
M12
54.6 (74)
73.8 (100)
M16
135 (183)
180.7 (245)
M20
273 (370)
364.4 (494)
TM
04
44
48
13
09
TM
04 93
05 381
0
1106
1107
2.5x2.5x1/8 in
A
C
B
D
TM
03
30
28
01
06
TM
04
27
19
29
08
C
A
B
31
Содержание SRP Series
Страница 1: ...GRUNDFOS INSTRUCTIONS SRP 60 Hz North America Installation and operating instructions ...
Страница 2: ......