Страница 2: ...os or a service station must be sent freight prepaid documentation supporting the warranty claim and or a Return Material Authorization must be included if so instructed GRUNDFOS WILL NOT BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES LOSSES OR EXPENSES ARISING FROM INSTALLATION USE OR ANY OTHER CAUSES THERE ARE NO EXPRESS OR IMPLIED WARRANTIES INCLUDING MERCHANTABILITY OR FITNESS FOR A PAR...
Страница 3: ...harged materials in accordance with the specific job site requirements The stainless steel construction of the SPE Environmental Pump makes it resistant to abrasion however no pump made of any material can forever withstand the destructive wear that occurs when constantly pumping sandy groundwater Determine the maximum depth of the well and the drawdown level at the pump s maximum capacity Pump se...
Страница 4: ...e pump and riser section be careful not to place bending stress on the pump by picking it up by the pump end only The drop cable should be secured to the riser pipe at frequent intervals to prevent sagging looping or possible cable damage 5 2 3 If plastic or flexible riser pipe is used Use the correct compound recommended by the pipe manufacturer or specific job specifications Make sure that joint...
Страница 5: ...switching surges The correct voltage rated surge arrester should be installed on the supply line side of the control box see fig 3 Fig 3 Single phase hookup with surge arrestor 5 3 4 Control box and surge arrester grounding The ground wire should be a bare copper conductor at least the same size as the drop cable wire size The ground wire should be run as short a distance as possible and be secure...
Страница 6: ...water is reached The pump should not be operated beyond its maximum flow rating and should not be stopped until the groundwater runs clear 6 If the groundwater is clean and clear when the pump is first started the valve should still be opened until the desired flow rate is reached 7 Disconnect the temporary piping arrangements and complete the final piping connections 8 Under no circumstances shou...
Страница 7: ...art pump 3 Gradually close the discharge valve 4 Read pressure at shut off 5 After taking reading open valve to its previous position 6 To calculate pump performance first convert psi reading to feet For water psi x 2 31 ____ ft 7 Add this to the total vertical distance from the pressure gauge to the water level in the well while the pump is running 8 Refer to the specific pump curve for the shut ...
Страница 8: ... Pump is damaged causing a motor overload Winding resistance TM05 0028 0511 Turn off power and disconnect the drop cable leads in the control box Using an ohmmeter set the scale selectors to Rx1 for values under 10 ohms and Rx10 for values over 10 ohms Zero adjust the meter and measure the resistance between leads Record the values Motor resistance values can be found in section 9 3 Electrical dat...
Страница 9: ... 02 0 5 A motor which may have been damaged by lightning or with damaged leads Do not pull the pump for this reason 10 000 20 000 0 01 0 02 A motor which definitely has been damaged or with damaged cable The pump should be pulled and repairs made to the cable or the motor replaced The motor will still operate but probably not for long Less than 10 000 0 0 01 A motor which has failed or with comple...
Страница 10: ... switches for operation Inspect contacts in control devices Replace worn or defective parts d Motor and or cable are defective How to check Turn off power Disconnect motor leads from control box Measure the lead to lead resistances with the ohmmeter Rx1 Measure lead to ground values with ohmmeter Rx100K Record measured values If open motor winding or ground is found remove pump and recheck values ...
Страница 11: ...nspect Clean strainer inspect integral check valve for blockage rinse out pump and re install d Pump is damaged How to check Check the pump s performance against its curve see section 8 1 Checking pump performance on p 7 If pump is damaged repair as necessary Rinse out pump and re install 3 Pump runs but at reduced capacity a Draw down is larger than anticipated How to check Check draw down during...
Страница 12: ...10 check wire size and length of run to pump panel If wire size is correct contact power company If not correct and or replace as necessary b Control box wiring and components How to check Check that control box parts match the parts list Check to see that wiring matches wiring diagram Check for loose or broken wires or terminals Correct as required c Defective capacitor How to check Turn off powe...
Страница 13: ...ee wire submersible pump motors kW Externally regulated Internally regulated 0 33 1 5 1 2 0 5 2 0 1 5 0 75 3 0 2 0 1 4 0 2 5 1 5 5 0 3 0 Grundfos submersible pump motors 60 Hz 4 inch single phase 2 wire motors control box not required Hp Ph Volt V S F Amperage Full load Line to line resistance ohms KVA code Max thrust lbs Full load Lock rotor S F amps Eff Power factor Blk Yel Red Yel Delta 0 5 1 2...
Страница 14: ... should be approximately equal to the calculated values 10 Disposal Distance from control box to pump motor ft 12 AWG wire resistance ohms 14 AWG wire resistance ohms 10 0 03 0 05 20 0 06 0 10 30 0 10 0 15 40 0 13 0 21 50 0 16 0 26 60 0 19 0 31 70 0 23 0 36 80 0 26 0 41 90 0 29 0 46 100 0 32 0 51 110 0 36 0 57 120 0 39 0 62 130 0 42 0 67 140 0 45 0 72 150 0 49 0 77 160 0 52 0 82 170 0 55 0 87 180 ...
Страница 15: ... 3500 Canada GRUNDFOS Canada Inc 2941 Brighton Road Oakville Ontario L6H 6C9 Phone 1 905 829 9533 Telefax 1 905 829 9512 México Bombas GRUNDFOS de México S A de C V Boulevard TLC No 15 Parque Industrial Stiva Aeropuerto Apodaca N L C P 66600 Phone 52 81 8144 4000 Telefax 52 81 8144 4010 SPE_ US book Page 17 Thursday May 5 2011 8 18 PM ...
Страница 16: ...e Grundfos the Grundfos logo and the payoff Be Think Innovate are registrated trademarks owned by Grundfos Management A S or Grundfos A S Denmark All rights reserved worldwide L SPE TL 01 05 11 US Repl L RF IO 001 02 00 2002 2011 Grundfos Pumps Corp Subject to alterations SPE_ US book Page 16 Thursday May 5 2011 8 18 PM ...