background image

English (GB)

8

4.4 Connecting the pipes

Compact the backfill around the pit up to the lower part of a pipe 
connection, before connecting the pipe.
Before connecting the pipes, check the following:
• The pipes and the gaskets must be clean.
• The inlet pipe must be properly aligned with the pipe 

connection.

Holes for inlet pipe, electrical connection and venting are to be 
drilled on site.
Mark the pit where the inlet is to be. Drill the marked spot with a 
hole saw. Remove all burrs from the hole. The hole saw is 
available as an accessory. See the table below.

4.4.1 PS.R.05 - PS.R.10

Fig. 9

Drilling the inlet hole, 

500-1200

4.4.2 PS.R.17

Drilling from the outside

If the hole diameter is bigger than 150 mm or the hole is to be 
drilled into a rib, drill in the centre of a rib. See fig. 

10

.

Fig. 10

Drilling from the outside

Drilling from the inside

Due to the circular pit shape, the pilot drill must extend beyond 
the cutting edge of the hole saw by at least 23 mm. The position 
of the hole is not an issue. See fig. 

11

.

Fig. 11

Drilling from the inside

We recommend that you provide the pit with a vent 
pipe (accessory).

Place inlet and outlet pipe connections in accordance 
with local regulations.

S

leev

e

Pi

pe

 

dia

m

eter

Product 

number

Hol

e

 sa

w

[mm]

Borehole 

tole

ranc

e

[mm]

Product 

number

LM50/40

40

96230763

51

- 2/+ 1

96571532

LM50/50

50

96230753

60

- 2/+ 1

96571533

LM50/63

63

96571523

75

- 2/+ 1

96571534

LM50/75

75

96571527

86

- 2/+ 1

96571535

LM50/90

90

96571528

102

- 2/+ 1

96571536

L965/110

110

91716040

127

- 0/+ 2

91713756

L965/160

160

91713754

177

- 0/+ 2

91713755

LM100/

200

200

91712032

212

- 2/+ 1

91712025

Pilot drill

91712026

T

M

02

 93

42

 24

04

We recommend that 
you drill the inlet 
hole in the 
cylindrical, smooth 
part.

The hole saw must have a cup depth of minimum 90 
mm.

The inlet hole must not be drilled in the pit close to 
pipes, float switches or other parts of the pit 
installation.

TM

04

 9

441

 42

10

TM

04

 9

573

 46

10

Содержание PS.R Series

Страница 1: ...Pumping station systems PS R 05 17 Installation and operating instructions GRUNDFOS INSTRUCTIONS...

Страница 2: ...e transducer 11 6 7 Other types of level control equipment 11 7 Electrical connection 11 7 1 Installing the cables 11 8 Product introduction 12 8 1 Product description 12 8 2 Applications 12 8 3 Pumpe...

Страница 3: ...s personal injury Before starting any work on the product make sure that the power supply has been switched off and that it cannot be accidentally switched on DANGER Crushing and suffocation hazard De...

Страница 4: ...customer The inspection must include the following Check the pumping station for transport damage Contact the transporter immediately if you detect any damage Check that the products delivered corresp...

Страница 5: ...ble and composed so that neither its properties nor the compaction will cause damage to the pit Grains larger than 16 mm must not be present The content of grains between 8 and 16 mm must not exceed 1...

Страница 6: ...corresponding to approx 20 cm after compaction Fig 6 Insufficient compaction under pipes Do not use plate compactors at a distance of less than 30 cm from the pit wall TM06 3602 0615 TM06 3603 0615 D...

Страница 7: ...sing soil volume The sand volume resting on the pit s shoulder is a stabilising force The sand volume is determined as a cone with hollow core as illustrated in fig 7 The inclination of the cone is il...

Страница 8: ...e to the circular pit shape the pilot drill must extend beyond the cutting edge of the hole saw by at least 23 mm The position of the hole is not an issue See fig 11 Fig 11 Drilling from the inside We...

Страница 9: ...pumps on auto coupling we recommend that you fit the chain in the foremost lifting eye of the lifting bracket The number of lifting eyes depends on the pump Fig 15 Chain fitted to the pump As it must...

Страница 10: ...installation and operating instructions for the level switch selected 6 1 Start and stop levels The effective volume of the pit must be so large that the number of starts does not exceed the maximum...

Страница 11: ...lectrical connection See the installation and operating instructions for the pump and the pump controller 7 1 Installing the cables The cables for the level switches and the pump s can be led into the...

Страница 12: ...mping station function as one unit and can contain the following five elements pit pump pump controller level controller accessories The pumping station system may not always have all five elements Ho...

Страница 13: ...M Modular system Pit material R Rotation moulded PE G Glass fibre reinforced plastic Pit sump diameter mm x 100 05 500 mm 08 800 mm 10 1000 mm 12 1200 mm 17 1700 mm Pit depth mm x 100 25 2500 mm Pump...

Страница 14: ...mp diameter mm x 100 05 500 08 800 10 1000 12 1200 17 1700 Pit depth mm x 100 25 2500 S One pump D Two pumps Pipe design DC Direct outlet common GC Goose neck common VC Valve chamber Pipe material and...

Страница 15: ...e pit according to local regulation All work in pits must be carried out according to local regulations and supervised by at least one person outside the pumping station When work is going on in or in...

Страница 16: ...If it is not possible to dispose of the product as a complete unit the pump and installation equipment can be removed from the pit and the pit can be filled and covered See also end of life informati...

Страница 17: ...fos Pumpstationen anlage vom Typ PS S Diese ist mit der CE Kennzeichnung auf dem Typenschild gekennzeichnet Voraussetzung f r die G ltigkeit der Erkl rung ist dass die Pumpstationenanlage zu jeder Zei...

Страница 18: ...h i zatwierdzonych przez Grundfos element w i produkt w wymienionych na tabliczce znamionowej My Grundfos o wiadczamy z pe n odpowiedzialno ci e nasza przepompownia typu PS S kt rej deklaracja niniejs...

Страница 19: ...mmelse och eller EG f rs kran om kompo nenters och produkters prestanda finns i monterings och driftsinstruktio nen som medf ljer dessa komponenter och produkter TR PS S tipi Grundfos pompa istasyonu...

Страница 20: ...ST 004 2011 010 2011 020 2011 TC RU C DK 30 01435 13 03 2020 TC RU C RU 30 01416 09 03 2020 153032 1 4859 016 59379130 2011 KAZ PUST 1 2 3 PUST 004 2011 010 2011 020 2011 TC RU C DK 30 01435 13 03 202...

Страница 21: ...TC RU C DK 30 01435 13 03 2020 TC RU C RU 30 01416 09 03 2020 153032 1 4859 016 59379130 2011 ARM PUST 1 2 3 PUST 004 2011 010 2011 020 2011 TC RU C DK 30 01435 13 03 2020 TC RU C RU 30 01416 09 03 20...

Страница 22: ...5 NOT RELEVANT 6 System or systems of assessment and verification of constancy of performance of the construction product as set out in Annex V System 3 7 In case of the declaration of performance co...

Страница 23: ...428 5005 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam ku 135 916 Seoul Korea Phone 82 2 5317 600 Telefax 82 2 5633 725 Latvia SIA GRUNDFOS Pumps Latvia Deglava biz...

Страница 24: ...0941 The name Grundfos the Grundfos logo and be think innovate are registered trademarks owned by Grundfos Holding A S or Grundfos A S Denmark All rights reserved worldwide Copyright Grundfos Holding...

Отзывы: