background image

English (GB)

4

3. Receiving the product

3.1 Transporting the product

The pit must be transported in a horizontal position and anchored 
to the transport vehicle. Accessories, if any, must be secured 
inside the pit.

The customer must provide appropriate lifting equipment at the 
place of unloading. The weight of the pit is stated on the 
nameplate.

Precautions during transport and handling

• Do not dump the pit from the lorry.
• Use approved straps of textile or similar materials when lifting 

the pit on to or down from a lorry or moving it on the 
construction site.

• Handle and lift the pit according to local regulations.
• Do not drag the pit over the ground.
• Point loads must not occur.
• The pit must not be exposed to sharp edges.
• Fix the pit securely during transport.
• When the pit is placed on the ground, make sure the ground is 

even.

Fig. 1

Lifting the pit

3.2 Inspecting the product

After transportation and before installation, the pumping station 
must be inspected by the customer.
The inspection must include the following:
• Check the pumping station for transport damage. Contact the 

transporter immediately if you detect any damage.

• Check that the products delivered correspond to the order.
• Check the positions and sizes of fittings.
• Retighten various connections, as they may have become 

loose during the transport.

• Check that all valves, except the draining valve in the valve 

chamber, are open.

• Check other equipment such as vent pipes.

When transporting and handling the pit at low 
temperatures, take into consideration that the pit 
impact resistance is reduced.

Before raising the pit into vertical position, remove 
transport supports and accessories from the inside of 
the pit.

DANGER
Crushing hazard

Death or serious personal injury
- Place the pit on even ground to prevent the pit in 

overturning.

If the pit is equipped with a lifting point, use it during 
handling.

TM

06

 0

063

 47

13

DANGER
Crushing hazard

Death or serious personal injury
- Make sure the lifting bracket or strap is tightened 

before attempting to lift the pit. Tighten if 
necessary. Carelessness during lifting or 
transportation may cause injury to persons or 
damage to the pit.

Содержание PS.R Series

Страница 1: ...Pumping station systems PS R 05 17 Installation and operating instructions GRUNDFOS INSTRUCTIONS...

Страница 2: ...e transducer 11 6 7 Other types of level control equipment 11 7 Electrical connection 11 7 1 Installing the cables 11 8 Product introduction 12 8 1 Product description 12 8 2 Applications 12 8 3 Pumpe...

Страница 3: ...s personal injury Before starting any work on the product make sure that the power supply has been switched off and that it cannot be accidentally switched on DANGER Crushing and suffocation hazard De...

Страница 4: ...customer The inspection must include the following Check the pumping station for transport damage Contact the transporter immediately if you detect any damage Check that the products delivered corresp...

Страница 5: ...ble and composed so that neither its properties nor the compaction will cause damage to the pit Grains larger than 16 mm must not be present The content of grains between 8 and 16 mm must not exceed 1...

Страница 6: ...corresponding to approx 20 cm after compaction Fig 6 Insufficient compaction under pipes Do not use plate compactors at a distance of less than 30 cm from the pit wall TM06 3602 0615 TM06 3603 0615 D...

Страница 7: ...sing soil volume The sand volume resting on the pit s shoulder is a stabilising force The sand volume is determined as a cone with hollow core as illustrated in fig 7 The inclination of the cone is il...

Страница 8: ...e to the circular pit shape the pilot drill must extend beyond the cutting edge of the hole saw by at least 23 mm The position of the hole is not an issue See fig 11 Fig 11 Drilling from the inside We...

Страница 9: ...pumps on auto coupling we recommend that you fit the chain in the foremost lifting eye of the lifting bracket The number of lifting eyes depends on the pump Fig 15 Chain fitted to the pump As it must...

Страница 10: ...installation and operating instructions for the level switch selected 6 1 Start and stop levels The effective volume of the pit must be so large that the number of starts does not exceed the maximum...

Страница 11: ...lectrical connection See the installation and operating instructions for the pump and the pump controller 7 1 Installing the cables The cables for the level switches and the pump s can be led into the...

Страница 12: ...mping station function as one unit and can contain the following five elements pit pump pump controller level controller accessories The pumping station system may not always have all five elements Ho...

Страница 13: ...M Modular system Pit material R Rotation moulded PE G Glass fibre reinforced plastic Pit sump diameter mm x 100 05 500 mm 08 800 mm 10 1000 mm 12 1200 mm 17 1700 mm Pit depth mm x 100 25 2500 mm Pump...

Страница 14: ...mp diameter mm x 100 05 500 08 800 10 1000 12 1200 17 1700 Pit depth mm x 100 25 2500 S One pump D Two pumps Pipe design DC Direct outlet common GC Goose neck common VC Valve chamber Pipe material and...

Страница 15: ...e pit according to local regulation All work in pits must be carried out according to local regulations and supervised by at least one person outside the pumping station When work is going on in or in...

Страница 16: ...If it is not possible to dispose of the product as a complete unit the pump and installation equipment can be removed from the pit and the pit can be filled and covered See also end of life informati...

Страница 17: ...fos Pumpstationen anlage vom Typ PS S Diese ist mit der CE Kennzeichnung auf dem Typenschild gekennzeichnet Voraussetzung f r die G ltigkeit der Erkl rung ist dass die Pumpstationenanlage zu jeder Zei...

Страница 18: ...h i zatwierdzonych przez Grundfos element w i produkt w wymienionych na tabliczce znamionowej My Grundfos o wiadczamy z pe n odpowiedzialno ci e nasza przepompownia typu PS S kt rej deklaracja niniejs...

Страница 19: ...mmelse och eller EG f rs kran om kompo nenters och produkters prestanda finns i monterings och driftsinstruktio nen som medf ljer dessa komponenter och produkter TR PS S tipi Grundfos pompa istasyonu...

Страница 20: ...ST 004 2011 010 2011 020 2011 TC RU C DK 30 01435 13 03 2020 TC RU C RU 30 01416 09 03 2020 153032 1 4859 016 59379130 2011 KAZ PUST 1 2 3 PUST 004 2011 010 2011 020 2011 TC RU C DK 30 01435 13 03 202...

Страница 21: ...TC RU C DK 30 01435 13 03 2020 TC RU C RU 30 01416 09 03 2020 153032 1 4859 016 59379130 2011 ARM PUST 1 2 3 PUST 004 2011 010 2011 020 2011 TC RU C DK 30 01435 13 03 2020 TC RU C RU 30 01416 09 03 20...

Страница 22: ...5 NOT RELEVANT 6 System or systems of assessment and verification of constancy of performance of the construction product as set out in Annex V System 3 7 In case of the declaration of performance co...

Страница 23: ...428 5005 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam ku 135 916 Seoul Korea Phone 82 2 5317 600 Telefax 82 2 5633 725 Latvia SIA GRUNDFOS Pumps Latvia Deglava biz...

Страница 24: ...0941 The name Grundfos the Grundfos logo and be think innovate are registered trademarks owned by Grundfos Holding A S or Grundfos A S Denmark All rights reserved worldwide Copyright Grundfos Holding...

Отзывы: