4.4 Checking the oil level

Fig. 12

Checking the oil level, KPL.900-1400, KWM.900-1400

Where nothing else is indicated, the position numbers refer to fig. 

12

 and/or the figure below each step.

1. Connect the handle (pos.18) to the rod (fig. 

7

, pos. 9).

2. Connect the handle (pos. 18) with rod (fig. 

7

, pos. 9) to the 

assembled oil pipe (pos. 27).

3. Remove the funnel (fig. 

7

, pos. 11) with intermediate fitting 

(fig. 

7

pos. 5) from the assembled oil pipe (pos. 27).

4. Connect the sight glass with fittings (fig. 

7

, pos. 2) to the 

four-way tee fitting on the assembled oil pipe (pos. 27).

5. Completely loosen the handle (pos. 18).
6. Close the lower isolating valve (pos. 26).
7. Fit the assembled oil pipe (step 4) in the lower oil plug space 

(pos. 29). See fig. 

12

.

8. Open the upper isolating valve (pos. 31).
9. Slowly fasten the handle (pos. 18) until the oil level is visible 

in the sight glass (pos. 32).

10. Wait until the oil level has stabilised.
11. Check the oil level marked "MIN" according to the pipe column 

diameter. See fig. 

12

, detail A.

12. After the oil level check, loosen the handle (pos. 18) to close 

the non-return valve (pos. 25).

13. Open the isolating valves (pos. 26 and 31) and drain the 

remaining oil from the sight glass (pos. 32) into an appropriate 
waste disposal container.

14. Disassemble the oil pipe and place it in the suitcase (fig.

7

) for 

storage.

15. Fit oil and casing plugs (fig. 

9

, pos. 21-24).

5. Oil quantity

5.1 Oil quantity according to column pipe diameter

Subject to alterations.

TM

06 32

32 501

4

Pos.

Description

18

Handle

25

Non-return valve

26

Isolating valve

27

Assembled oil pipe

29

Lower oil plug space

31

Isolating valve

32

Sight glass with fittings

TM

06

 3

233

 50

14

TM

06

 32

34

 50

14

TM

06

 3

235

 50

14

A

A

31

18

26

27

29

25

32

18

9

27

11 5

T

M

06

 32

36

 50

14

Note

Handle the sight glass (pos. 32) with care.

Column pipe diameter

[DN]

Quantity of oil

[l]

700

6

800

6

900

12

1000

13

1200

24

1400

34

2

Содержание KPL.700-1400

Страница 1: ...Oil service kit KPL 700 1400 KWM 700 1400 Service instructions GRUNDFOS INSTRUCTIONS...

Страница 2: ...2 5 1 Oil quantity according to column pipe diameter 12 Warning If these safety instructions are not observed it may result in personal injury Warning During electrical installation make sure that the...

Страница 3: ...tee fitting pos 14 6 Connect the isolating valve pos 17 to the barrel nipple pos 7 7 Connect the isolating valve with barrel nipple pos F and step 6 to the isolating valve with three way tee fitting p...

Страница 4: ...te pipe pos D and step 4 to the isolating valve with barrel nipple and three way tee fitting pos G and step 7 9 Connect the plug pos 19 The oil pipe is now completely assembled See fig 2 Fig 2 Assembl...

Страница 5: ...ed stub intermediate fitting and air plug step 6 fitted in the upper plug space pos 32 9 Open the isolating valve pos 31 10 Slowly tighten the handle pos 24 until the oil starts to flow 11 Connect the...

Страница 6: ...35 in the upper casing plug space pos 36 See fig 5 7 Close the isolating valves pos 17 and 31 8 Pour the recommended quantity of oil through the funnel pos 13 See section 5 Oil quantity 9 After comple...

Страница 7: ...Remove the funnel fig 1 pos 13 with intermediate fitting fig 1 pos 4 from the assembled oil pipe pos 35 4 Connect the plug pos 19 to the four way tee fitting on the assembled oil pipe pos 35 TM06 3204...

Страница 8: ...he isolating valves pos 17 and 37 11 Slowly fasten the handle pos 24 until the oil level is visible in the sight glass pos 38 12 Wait until the oil level has stabilised 13 Check the oil level marked M...

Страница 9: ...to the assembled isolating valve and intermediate pipe pos D and step 4 6 Connect the plug pos 14 to the assembled handle rod intermediate pipe oil pipe isolating valve and intermediate pipe pos E and...

Страница 10: ...intermediate fitting and air plug step 6 fitted in the upper oil plug space pos 28 See fig 10 9 Open the isolating valve pos 26 10 Slowly tighten the handle pos 18 until the oil starts to flow Make su...

Страница 11: ...in the upper casing plug space pos 30 See fig 11 7 Close the isolating valve pos 26 8 Pour the recommended quantity of oil through the funnel pos 11 See section 5 Oil quantity 9 After completing the...

Страница 12: ...ible in the sight glass pos 32 10 Wait until the oil level has stabilised 11 Check the oil level marked MIN according to the pipe column diameter See fig 12 detail A 12 After the oil level check loose...

Страница 13: ...1 Telefax 81 35 448 9619 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam ku 135 916 Seoul Korea Phone 82 2 5317 600 Telefax 82 2 5633 725 Latvia SIA GRUNDFOS Pumps Lat...

Страница 14: ...4410 The name Grundfos the Grundfos logo and be think innovate are registered trademarks owned by Grundfos Holding A S or Grundfos A S Denmark All rights reserved worldwide Copyright Grundfos Holding...

Отзывы: