background image

English (GB)

11

7. Adjustment 

The JP Booster PT comes with the following factory 
settings in bar:

7.1 Calculating the cut-in and cut-out 

pressures 

The cut-in pressure is the sum of these variables:

required minimum pressure at the highest 
tapping point

head

 

from the pump to the highest tapping point

pressure loss in pipes.

Recommended cut-out pressure:
cut-in pr 1.0 - 1.5 bar.

7.2 Adjusting the precharge pressure

When the pump cut-in pressure has been 
determined, the required precharge pressure of the 
diaphragm tank can be calculated. The precharge 
pressure must be adjusted to 90 % of the cut-in 
pressure.

See the installation and operating instructions for the 
diaphragm tank. 

7.3 Setting the pressure switch

The cut-out pressure must be lower than the 
maximum operating pressure of the pump and tank. 

Remove the cover from the pressure switch to 
access the adjusting screws. See fig. 4.

Fig. 4

Pressure switch

Setting the cut-out pressure

1. Turn screw (pos. A) clockwise to increase the 

cut-out pressure. 
Turn it counter-clockwise to reduce the cut-out 
pressure.
The differential pressure range remains 
unchanged.

2. Start the pump and check by reading the 

pressure gauge whether the desired cut-out and 
cut-in pressures have been obtained.

Setting the cut-in pressure

1. Turn screw (pos. B) clockwise to reduce the 

cut-in pressure. 
Turn it counter-clockwise to increase the cut-in 
pressure.
The differential pressure range is widened and 
narrowed respectively.

2. Start the pump and check by reading the 

pressure gauge whether the desired cut-out and 
cut-in pressures have been obtained.

Repeat the procedure until the right cut-in and 
cut-out pressures have been obtained.

Pump

Tank 

precharge 

pressure

Cut-in 

pressure

Cut-out 

pressure

JP 5 & 6

1.9

2.2

3.3

Note

The cut-out pressure must not exceed 
the maximum discharge pressure of the 
pump.

Caution

When adjusting/reading the precharge 
pressure, make that there is no water 
pressure on the diaphragm tank from 
the pipework.

Note

If the pressure switch setting is 
changed, the precharge pressure must 
be adjusted too.

Warning

Switch off the power supply before 
adjusting the pressure switch.

Fit the cover on the pressure switch 
before you switch on the power supply 
to check the cut-in and cut-out 
pressure.

TM

01

 69

14

 37

99

Отзывы: