Operation
21 | 32
BA_
TD
3-
G
H
000en
_015_A
uf
ber
ei
tu
ngs
gr
uppe
.doc
x
6.2 Installation/replacement of the filling
cartridge
To replace the filling cartridge, proceed as follows:
1.
Close the valve on the inlet side.
2.
Open the vent valves.
»
The treatment group is depressurised.
3.
Dismantle the plastic cylinder (turn left).
4.
Replace the exhausted cartridge by a new cartridge.
5.
Remount the plastic cylinder (turn right).
»
The treatment group is operational.
6.
Put the treatment group into operation
(refer to chapter 5.1).
Содержание thermaliQ:HB2
Страница 1: ...We understand water Treatment group thermaliQ HB2 Operation manual...
Страница 31: ......