background image

 

Operation 

 

 

 

21 | 32 

BA_

TD

3-

G

H

000en

_015_A

uf

ber

ei

tu

ngs

gr

uppe

.doc

6.2  Installation/replacement of the filling 

cartridge 

To replace the filling cartridge, proceed as follows: 

1. 

Close the valve on the inlet side. 

2. 

Open the vent valves. 

» 

The treatment group is depressurised. 

 

 

 

3. 

Dismantle the plastic cylinder (turn left). 

4. 

Replace the exhausted cartridge by a new cartridge. 

5. 

Remount the plastic cylinder (turn right). 

» 

The treatment group is operational. 

6. 

Put the treatment group into operation  
(refer to chapter 5.1). 

Содержание thermaliQ:HB2

Страница 1: ...We understand water Treatment group thermaliQ HB2 Operation manual...

Страница 2: ...itten consent of Gr nbeck Wasseraufbereitung GmbH no part of this manual may be reproduced in any way nor may any part be processed duplicated or distributed using electronic systems Non compliance wi...

Страница 3: ...11 3 3 Accessories 12 3 4 Functional description 12 4 Installation 14 4 1 Requirements in relation to the installation site 14 4 2 Checking the scope of supply 15 4 3 Installing the product 16 5 Star...

Страница 4: ...ing documents shall be deemed as applicable documents for the treatment group thermaliQ HB2 The manuals of all accessories used 1 2 Target group This manual is intended for specialist installers and o...

Страница 5: ...u must comply with in order to avoid damage to property This symbol identifies important information about the product or its handling This symbol identifies work that may only be carried out by speci...

Страница 6: ...steps does not matter Action Instruction Multi step instruction and chronological sequence of steps is important 1 First action a first step b second step 2 Second action Result following an instruct...

Страница 7: ...s or orders Enter the necessary information in the table below to have it readily available when necessary Item Designation Item Designation 1 Observe operation manual 2 Max operating pressure 3 Ambie...

Страница 8: ...be void Only have persons working on your product that have read and understood the present manual and that are qualified to do such work due to their vocational training Only operate the product if...

Страница 9: ...s may occur NOTE without warning triangle means that property damage may occur 2 3 Regulations When installing and starting up the system amongst others comply with the following regulations and guide...

Страница 10: ...er Comply with the following instructions to ensure the proper and safe functioning of the product Arrange for a specialist installer to carry out installation start up and maintenance Have the produc...

Страница 11: ...e full demineralisation of raw water for the initial filling or make up water feed of heating systems The treatment group thermaliQ HB2 may only be installed in horizontal pipes 3 2 Product components...

Страница 12: ...demineralisation of water for heating systems desaliQ connection adapter 707 276 Adapter to connect the filling cartridge desaliQ HB4 to the treatment group thermaliQ HB2 desaliQ hose kit 126 400 2 dr...

Страница 13: ...pletely mixed state The cation exchanger resin removes all positively charged ions the so called cations from the raw water All cations contained in the water such as calcium magnesium sodium are exch...

Страница 14: ...inking water filter pureliQ 2 Filling group thermaliQ SB13 4 1 Requirements in relation to the installation site Observe local installation directives general guidelines and technical specifications T...

Страница 15: ...reliQ K refer to chapter 4 item 1 must be installed upstream of the product A system separator e g filling group thermaliQ SB13 must be installed upstream of the product as per DIN EN 1717 refer to ch...

Страница 16: ...he water meter screw connection at the outlet side of the treatment group 3 Install the treatment group in between without any mechanical stress On the inlet side use the flat gasket and on the outlet...

Страница 17: ...Starting up the product 5 1 1 Deaerate the product 1 Open both vent valves 2 Open the shut off valve As soon as no air escapes any longer 3 Close the vent valve on the inlet side 4 Close the vent val...

Страница 18: ...ng cell 1 Open the shut off valve 2 Visually check for leaks 3 Press the button of the conductivity measuring cell The LED of the conductivity measuring cell is flashing the conductivity measuring cel...

Страница 19: ...r When handing over the product proceed as follows 1 Inform the owner user how the water treatment group works 2 Hand over all documents to the owner user for keeping 3 Use the manual to brief the own...

Страница 20: ...uring cell The measuring cell is activated After the activation an LED is flashing The conductivity measuring cell switches off after a period of 45 minutes Display of the conductivity measuring cell...

Страница 21: ...roceed as follows 1 Close the valve on the inlet side 2 Open the vent valves The treatment group is depressurised 3 Dismantle the plastic cylinder turn left 4 Replace the exhausted cartridge by a new...

Страница 22: ...onductivity measuring cell 1 Remove the lid of the conductivity measuring cell 2 Remove the circuit board 3 Remove the used battery 4 Insert a new battery 5 Close the lid of the conductivity measuring...

Страница 23: ...t once a year Proper operation and maintenance of the product are essential for trouble free and hygienic operation A maintenance contract ensures that all the required maintenance work will be perfor...

Страница 24: ...ck for leaks 2 Check the function of the conductivity measuring cell refer to chapter 6 1 7 3 Maintenance In order to carry out maintenance proceed as follows 1 Visually check for leaks 2 Check the fu...

Страница 25: ...sumables Product Order no Filling cartridge desaliQ HB2 707 745 Battery CR2032 WZ9 790075e 7 5 Spare parts You may order spare parts and consumables from your local Gr nbeck representative refer to th...

Страница 26: ...of conductivity measuring cell does not flash The battery is exhausted Replace the battery refer to 6 3 The conductivity measuring cell is defective Replace the conductivity measuring cell LED of con...

Страница 27: ...this product or the electrical and electronic components must not be disposed with household waste Dispose of electrical and electronic products and components in an environmentally sound manner For...

Страница 28: ...n mm 55 D Height below centre of pipe connection with cylinder mm 380 E Clearance required to replace the filling cartridge mm 100 F Min distance to wall mm 70 G Total height mm 435 Operating weight k...

Страница 29: ...nts of EU Directive 2011 65 EU of the European Parliament and of the Council of June 8 2011 on the restriction of the use of certain hazardous substances in electrical and electronic equipment This ce...

Страница 30: ...ivity measuring cell 12 19 23 25 27 D Disposal 28 I Inspection 24 25 Installation 10 11 15 M Maintenance 9 11 24 25 P Product components 12 S Spare parts 9 26 Start up 10 11 18 T Technical specificati...

Страница 31: ......

Страница 32: ...Gr nbeck Wasseraufbereitung GmbH Josef Gr nbeck Str 1 89420 Hoechstaedt GERMANY For more information go to www gruenbeck com 49 9074 41 0 49 9074 41 100 info gruenbeck com www gruenbeck com...

Отзывы: