GrowSpan 105175F Скачать руководство пользователя страница 4

GROWSPAN

 ECONOMY COLD FRAMES

4

Revision date: 01.01.16

REQUIRED TOOLS

The following list identifies the main tools needed to  

assemble the shelter. Additional tools and supports may be 

needed depending on the structure, location, and  

application.
•  Tape measure or measuring device
•  Fine point marker to mark the hole locations to be 

drilled in tubing

•  Variable speed drill and impact driver (cordless with 

extra batteries works best) 

•  Wrenches or ratchet and socket set (recommended)
•  Ropes long enough to reach over the frame (if optional 

cover was purchased)

•  Hammers and gloves
•  Metal file
•  Duct tape (supplied by customer)
•  Box cutter or utility knife
•  Ladders, work platforms, and other machinery for lifting  

designed to work safely at the height of the frame

UNPACK AND IDENTIFY PARTS

The following steps will ensure that you have all the  

necessary parts before you begin to assemble the shelter 

frame.
1.  Unpack the contents of the shipment and place where  

you can easily inventory the parts. Refer to the Bill of  

Materials/Spec Sheets.

2.  Verify that all parts listed on the Bill of Materials/Spec  

Sheets are present. If anything is missing or you have  

questions, consult the Pictorial Parts Guide and all  

diagrams for clarification, or contact Customer Service.

 

NOTE:

 At this time, you do not need to open the plastic  

 

bags containing smaller parts such as fasteners or  

 

washers (if equipped).

SPECIAL NOTE: Baseboard Installation Procedure

These instructions describe installing a baseboard 

(recommended) at ground level along each side of the 

frame. The baseboard runs from the front to the back of the 

frame on the outside of the ground posts. 

This baseboard is 

not included

 with the shipment and must 

be supplied by the customer. Treated or recycled plastic 

lumber can be used for a baseboard.

The baseboard, when installed properly, helps prevent the 

ground posts from sinking into the ground when anchored. 

Depending on the building, it also provides a surface to 

attach struts or other building components. 

Consult these instructions, or contact Customer Service for 

additional information regarding baseboards.

Anchoring the Frame 

 

Before installing a cover, the frame must be anchored to 

prevent personal injury and property damage.

Anchor kits are 

not included 

with the shipment and must be 

purchased or supplied by the customer. 

Consult the MUST READ document for anchoring 

information and suggestions. Please call Customer Service 

at 1-800-245-9881 for additional anchoring information and 

to purchase anchors for your cold frame.

Film Cover and Optional End Frame Kits and Panels

If your building includes a film cover and you have also 

purchased optional end frame kits and panels, read all 

instructions 

before you install the main cover film

. Many 

end frame kits require installation before a main cover is 

attached to the main building frame.

Installing the main cover film 

before

 you install the end 

frame and end panel may require the partial removal of the 

cover film to install the end frames and panels. 

This does not apply to frames that do not have end frames 

or end panels.

Содержание 105175F

Страница 1: ... 105177F 12 W x 7 H x 30 L 105178F 12 W x 7 H x 40 L 105179F 12 W x 7 H x 50 L Photo may show a different but similar model Frame is shown with optional cover GrowSpan Economy Cold Frames 2016 GrowSpan All Rights Reserved Reproduction is prohibited without permission ...

Страница 2: ...ortant step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing the site or anchoring the structure Location should be away from structures that could cause snow to drift o...

Страница 3: ...owing definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of the frame assembly where legs purlins and rafter pipes are ins...

Страница 4: ...ctions describe installing a baseboard recommended at ground level along each side of the frame The baseboard runs from the front to the back of the frame on the outside of the ground posts This baseboard is not included with the shipment and must be supplied by the customer Treated or recycled plastic lumber can be used for a baseboard The baseboard when installed properly helps prevent the groun...

Страница 5: ...01 16 The following diagrams and photos will help you identify the different parts FA4482B Tek Screw Swaged Plain Swaged and Plain Rafter Sections not all pieces are shown 105108 Cross Connector 104545 Post Driver QH1070 Pipe Strap 104543 Ground Post ...

Страница 6: ...ame For details of each assembly procedure consult the individual sections of these instructions See illustration below to identify main parts of the cold frame 1 Locate the required parts for each assembly procedure 2 Assemble the rafters and frame 3 Attach recommended baseboards 4 Anchor the frame 5 Attach cover film if equipped Additional purchase may be required GrowSpan Economy Cold Frames ...

Страница 7: ...e at least as long as the building from the first stake at 90 NOTE A transit can be used to ensure an accurate 90 angle or the 3 4 5 rule can be used Refer to diagram Using multiples of 3 4 5 such as 6 8 10 or 12 16 20 helps to maintain an accurate 90 angle 5 After squaring the position of the building measure the length and drive the next corner ground post 6 Repeat the same step for the last cor...

Страница 8: ...h joint and the rafter positioned on a flat surface secure two 2 of the joints with a single self tapping Tek screw Position Tek screw approximately 1 from pipe joint ATTENTION Install the screws so they will not touch the cover once it is installed if equipped This is typically on the backside of the rafter which will be the surface visible from the inside of the shelter once the frame is assembl...

Страница 9: ...rk here FRAME ASSEMBLY Gather the parts All rafter assemblies 1 05 purlin pipes Tek screws FA4482B Lifts ladders and assistants as needed Frame Assembly Procedure 1 Using the proper lifts and with assistance carefully stand the first end rafter assembly and place the leg pipes into the first set of ground posts 2 Lower the rafter legs into the ground post to the 6 lines marked on the pipes earlier...

Страница 10: ...in using a Tek screw 10 Choose another rafter assembly and set it in position 11 Secure the rafter legs to the ground posts as previously described 12 Repeat the above steps as needed to stand place and secure the remaining rafters to complete the frame assembly NOTE If the last end rafter is plumb and the purlin extends beyond the end of the rafter cut the last section of purlin pipe to the requi...

Страница 11: ...is an integral part of the cold frame construction Improper anchoring may cause instability and failure of the structure to perform as designed Failing to anchor the shelter properly will void the manufacturer s warranty and may cause serious injury and damage If the QH1070 brackets were attached to the ground posts as described earlier in these instructions the baseboard can be secured using lag ...

Страница 12: ...the baseboard as shown below 2 Continue to attach the U channel sections working up and over the first end rafter ATTENTION The U channel is attached to the top of the rafter and will bend with the curve of the rafter as it is attached See diagram that follows Tek screw U Channel Dashed line represents the U channel 3 Repeat these steps for the remaining end rafter 4 After attaching the poly latch...

Страница 13: ...o the U channel to secure the cover ATTENTION Center the main cover front to back and side to side to ensure that enough cover material is present to lock into the U channel If used the rope can remain in place to temporarily secure the cover if needed Remove the ropes as the cover is secured to the frame IMPORTANT To prevent damage to the main cover during installation additional assistants may b...

Страница 14: ...ess accumulation Use tools that will not damage the cover when removing snow Check the contents of the shelter to verify that nothing is touching the cover that could cause damage If the cold frame is moved inspect all parts and connections before reassembling For replacement or missing parts call 1 800 245 9881 for assistance NOTE Maintain an even length along the side The final stretching of the...

Страница 15: ...15 GROWSPAN ECONOMY COLD FRAMES Revision date 01 01 16 105176F 12 x 20 105177F 12 x 30 105179F 12 x 50 105178F 12 x 40 105175F 12 x 10 12 Wide Cold Frames ...

Страница 16: ...GROWSPAN ECONOMY COLD FRAMES 16 Revision date 01 01 16 105176FF 12 x 20 105177FF 12 x 30 105179FF 12 x 50 105178FF 12 x 40 105175FF 12 x 10 12 Wide Cold Frames with covers FF skus only ...

Страница 17: ...17 GROWSPAN ECONOMY COLD FRAMES Revision date 01 01 16 This page is reserved for customer notes ...

Отзывы: