GrowSpan 105158F Скачать руководство пользователя страница 13

13

GROWSPAN

 ECONOMY COLD FRAMES

Revision date: 01.01.16

COVER FILM INSTALLATION (CONTINUED)
Install the Cover Film 

After all of the poly latch U-channel is attached to the 

shelter, the cover film is unpacked and pulled into place. 

Assistants positioned inside the frame along the length of 

the film edge can help when pulling the film into place. In 

some instances, ropes or straps are used to pull the cover 

film onto the frame depending on the length of the cover 

and the width of the frame.

 

WARNING: 

To prevent damage to the cover film and 

to prevent serious personal injury, DO NOT attempt to 

install the main cover on windy or stormy days.

 

Continue with the steps that follow.
1.  Unpack the cover film and position it at the base along 

one side of the frame.

2.  With assistance, pull the cover film over the frame. 

 

ATTENTION:

 Depending on the height and width of the 

frame, ropes can be tied to the film edge, thrown over 

the frame, and pulled to lift the cover film into place.  

See the diagram below. 

 

The ropes must be long enough to reach over the 

top of the frame to the other side. Long buildings will 

require additional ropes to prevent tearing the cover 

film when it is pulled into place.

3.  With the film in place on the frame, center the cover 

side-to-side and end-to-end. 

4.  Once the cover film is in place and centered on the 

frame, begin at the peak of one end rafter and install 

the wire spring into the U-channel to secure the cover. 

 

ATTENTION:

 Center the film end-to-end and side-to-

side to ensure that enough cover material is present to 

lock into the U-channel. 

 

If used, ropes can remain in place to temporarily secure 

the cover if needed. Remove the ropes as the cover is 

secured to the frame. 

 

IMPORTANT:

 To prevent damage to the film during 

installation, additional assistants may be needed.

Photos show installing the spring into the U-channel on 

the outside of a frame. The process is the same for the 

U-channel attached to the top of the end rafters.

5.  Continue adding the spring into the U-channel at the 

top of the first end rafter. Ensure that an even amount 

of the cover film is exposed and maintained along the 

edge of the frame as it is attached. 

 

NOTE:

 The cover film is cut longer/wider than is 

required to cover the frame. For easier anchoring, allow 

approximately 8" to extend past the edge of the end 

rafter as the cover is anchored in place.

6.  Continue down both edges of the first end rafter until 

the entire length of the end of the cover is secured in 

place.

7.  Stretch the cover film to the other end of the building 

and repeat the steps to secure the cover in the  

U-channel. 

 

NOTE:

 Pull the cover tight as the spring is inserted into 

the U-channel.

8.  After the cover is stretched end-to-end and secured 

using the spring and U-channel, move to one side of 

the frame and repeat the steps to anchor the cover film 

to the first side.  

 

Begin at one end of the U-channel and work toward the 

other.  

Ropes

Shelter shown above may be a different length than 

the actual model. Ropes may not be needed.

Содержание 105158F

Страница 1: ...x 7 H x 10 L 105160F 6 W x 7 H x 15 L 105161F 6 W x 7 H x 20 L Photo may show a different but similar model Frame is shown with optional cover GrowSpan Economy Cold Frames 2016 GrowSpan All Rights Res...

Страница 2: ...rtant step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure un...

Страница 3: ...wing definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of conne...

Страница 4: ...tions describe installing a baseboard recommended at ground level along each side of the frame The baseboard runs from the front to the back of the frame on the outside of the ground posts This basebo...

Страница 5: ...and photos will help you identify the different parts and show you how they are used Not all parts are shown FA4482B Tek Screw Swaged Plain Swaged and Plain Rafter Sections not all pieces are shown 10...

Страница 6: ...me For details of each assembly procedure consult the individual sections of these instructions See illustration below to identify main parts of the cold frame 1 Locate the required parts for each ass...

Страница 7: ...at least as long as the building from the first stake at 90 NOTE A transit can be used to ensure an accurate 90 angle or the 3 4 5 rule can be used Refer to diagram Using multiples of 3 4 5 such as 6...

Страница 8: ...int and the rafter positioned on a flat surface secure each joint using a single self tapping Tek screw Position Tek screws approximately 1 from pipe joint ATTENTION Install the screws so they will no...

Страница 9: ...k here FRAME ASSEMBLY Gather the parts All rafter assemblies 1 05 purlin pipes Tek screws FA4482B Lifts ladders and assistants as needed Frame Assembly Procedure 1 Using the proper lifts and with assi...

Страница 10: ...purlin using a Tek screw 10 Choose another rafter assembly and set it in position 11 Secure the rafter legs to the ground posts as previously described 12 Repeat the above steps as needed to stand pl...

Страница 11: ...l part of the cold frame construction Improper anchoring may cause instability and failure of the structure to perform as designed Failing to anchor the shelter properly will void the manufacturer s w...

Страница 12: ...s attach a section of the poly latch U channel 102179 to the top of the first end rafter Begin at the top of the baseboard as shown below 2 Continue to attach the U channel sections working up and ove...

Страница 13: ...the U channel to secure the cover ATTENTION Center the film end to end and side to side to ensure that enough cover material is present to lock into the U channel If used ropes can remain in place to...

Страница 14: ...cess accumulation Use tools that will not damage the cover when removing snow Check the contents of the shelter to verify that nothing is touching the cover that could cause damage If the cold frame i...

Страница 15: ...15 GROWSPAN ECONOMY COLD FRAMES Revision date 01 01 16 105159F 6 x 10 105160F 6 x 15 105161F 6 x 20 105158F 6 x 5 6 Wide Cold Frames...

Страница 16: ...GROWSPAN ECONOMY COLD FRAMES 16 Revision date 01 01 16 6 Wide Cold Frames with optional covers 105159FF 6 x 10 105160FF 6 x 15 105161FF 6 x 20 105158FF 6 x 5...

Страница 17: ...17 GROWSPAN ECONOMY COLD FRAMES Revision date 01 01 16 Page is reserved for customer notes...

Отзывы: