U-Channel

End Rafter

3.  Repeat these steps for the remaining side.
4.  With the U-channel secured to the sides of the frame in 

the desired location, attach poly latch U-channel to the 

top of one end rafter using Tek screws. 

 

NOTE:

 The poly latch U-channel will bend with the 

curve of the rafter as it is attached.

5.  Repeat the steps to attach the U-channel to the top of 

the remaining end rafter and continue with the main 

cover installation.

Diagram shows the ribbon board installed for a roll-up 

side panel. U-channel for your cold frame cover may be 

installed in a different location.

OPTIONAL MAIN COVER INSTALLATION WITH ROLL-

UP SIDES (CONTINUED)

Shelter shown above may be a different length than 

actual model.

Ropes

Install Main Cover with Roll-up Sides

Gather the parts:
•  Main cover
•  Ropes long enough to reach over the frame (provided 

by customer)

•  U-channel spring
•  Box cutter or utility knife 

Assembly Procedure

 

After the poly latch U-channel is attached to the frame, 

unpack the main cover and pull into place. Ropes or straps 

are typically used to pull the main cover onto and over the 

frame.

WARNING: 

To prevent damage to the cover and to 

prevent serious personal injury, DO NOT attempt to 

install the main cover on windy or stormy days.

1.  Unpack the main cover and position it at the base along 

one side of the frame.

2.  Make small holes along the edge of the cover at evenly 

spaced intervals and tie rope to the cover. (The length 

of the cover determines the number of holes that are 

needed to attach the ropes.) 

 

NOTE:

 The ropes must be long enough to reach over 

the top of the building to the other side. Long buildings 

will require additional ropes to prevent tearing the main 

cover when it is pulled into place.

3.  After tying the ropes to the main cover, throw the ropes 

over the top of the frame and pull the cover into place. 

Cover must be centered side-to-side and end-to-end. 

IMPORTANT:

 To prevent damage to the main cover 

during installation, additional personnel and lifts may be 

needed.

4.  Once the main cover is in place and centered on the 

frame, begin at the peak of one end rafter and install 

the wire spring into the U-channel to secure the cover. 

 

ATTENTION:

 Center the main cover front to back and 

side-to-side to ensure that enough cover material is 

present to lock into the U-channel. 

The excess cover 

along each side is rolled up when the roll-up side 

assemblies are installed.

 

 

The rope can remain in place to temporarily secure 

the cover if needed. Remove the ropes as the cover is 

secured to the frame. 

 

Содержание 103103

Страница 1: ...16 STK DIMENSIONS 103103 20 W x 10 H x 24 L 103104 20 W x 10 H x 48 L 103105 20 W x 10 H x 96 L 2016 GrowSpan All Rights Reserved Reproduction is prohibited without permission GrowSpan Round Cold Fra...

Страница 2: ...tant step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure und...

Страница 3: ...lowing definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of con...

Страница 4: ...ly inventory the parts Refer to the Bill of Materials Spec Sheets 2 Verify that all parts listed on the Bill of Materials Spec Sheets are present If anything is missing or you have questions consult t...

Страница 5: ...16 The following graphics and photos will help you identify the different parts Some parts are not shown 102675 Ground Post FA4482B Tek Screw Swaged Plain Swaged and Plain Rafter Sections 102548 Cros...

Страница 6: ...overview of the process for assembling your cold frame For details please see section Assembling the Cold Frame Components See illustration below to identify main parts of the cold frame 1 Locate the...

Страница 7: ...ts must be equal for the building to be square 7 Check all dimensions and adjust if needed before driving the remaining posts to the required height 8 After all four corner posts are accurately instal...

Страница 8: ...s until the rafter is attached to the ground posts This allows holes in the drilled pipes to be aligned with those in the ground posts Install the screws so they will not touch the cover once it is in...

Страница 9: ...er clamp positions and repeat Steps 4 through 6 to install the purlin pipes in those locations 8 Continue adding rafters and purlin pipes until the frame is assembled Secure all purlin splices using T...

Страница 10: ...rd is not included with the shipment and must be supplied by the customer Treated or recycled plastic lumber works well for a baseboard The baseboard when installed properly helps prevent the ground p...

Страница 11: ...amps that may contact the cover ANCHOR THE ASSEMBLED FRAME At this point anchor the frame Consult the MUST READ document for anchoring information and suggestions Please call customer service at 1 800...

Страница 12: ...skip this procedure and continue with the OPTIONAL MAIN COVER INSTALLATION WITH ROLL UP SIDES procedure 1 Using Tek screws attach a section of the poly latch U channel 102179 to the top of the first e...

Страница 13: ...re the cover ATTENTION Center the main cover front to back and side to side to ensure that enough cover material is present to lock into the U channel If used the rope can remain in place to temporari...

Страница 14: ...depends on the roll up assembly NOTE Attach U channel to baseboard or to the ground posts if no roll up sides are desired 2 Attach the poly latch U channel flush with the ends of the ribbon board usi...

Страница 15: ...r and to prevent serious personal injury DO NOT attempt to install the main cover on windy or stormy days 1 Unpack the main cover and position it at the base along one side of the frame 2 Make small h...

Страница 16: ...nd and secured using the spring and U channel move to one side of the frame and repeat the steps to anchor the main cover to the first side Begin at one end of the U channel and work toward the other...

Страница 17: ...r material if equipped to verify that it is in good repair Do not climb or stand on the cold frame at anytime Remove debris and objects that can accumulate on the cold frame Use tools that will not da...

Страница 18: ...ROUND COLD FRAMES 18 Revision date 01 01 16 QUICK START GUIDE 20 Wide Round Cold Frame Shelter Width 20 0 10 7 13 16 Height Grid Represents 12 Squares FRONT Frame shown may differ in length from actu...

Страница 19: ...ound Post 102675 Ground Post Purlin Connection See Connection Note Purlin Connection See Connection Note Purlin Connection See Connection Note Strut Connection Strut Connection Connection Note Purlin...

Страница 20: ...ROUND COLD FRAMES 20 Revision date 01 01 16 SIDE PROFILE 103103 131S075 131S075 131S075 131S0735 24 0 Shelter Length 48 Rafter Spacing center to center Customer Supplied Baseboards Purlin Assembly on...

Страница 21: ...ES 21 Revision date 01 01 16 SIDE PROFILE 103104 48 0 Shelter Length 48 Rafter Spacing 131S075 131S075 131S075 131S075 131S075 131S075 131P0735 131S075 center to center Customer Supplied Baseboards Pu...

Страница 22: ...OWSPAN ROUND COLD FRAMES 22 Revision date 01 01 16 SIDE PROFILE 103105 15 131S075 1 131P0735 96 0 Shelter Length center to center Customer Supplied Baseboards Purlin Assembly 48 on center Rafter Spaci...

Страница 23: ...OWSPAN ROUND COLD FRAMES 23 Revision date 01 01 16 CONNECTIONS Purlin Mid Rafter Connection View 2 Purlin End Rafter Connection View1 Rafter Strut Connection View 3 Rafter Ground Post Connection View...

Страница 24: ...n Rafter Purlin Cross Connector View 1 Purlin End Rafter Connection Connection Connection Connection Purlin End Clamp Rafter Purlin Tek Screws 1 through clamp into purlin 1 through clamp into rafter V...

Страница 25: ...GROWSPAN ROUND COLD FRAMES 25 Revision date 01 01 16 Space below is reserved for customer notes...

Отзывы: