background image

 

(STAGE 1) Cutting the Opening

Mark Location of Front Sloping Pieces

Cutting the Front Sloping Pieces

Top of FSP: 

Have an assistant hold the long side of the top 
of the Front Sloping Piece on the outside the 
marks you made on the upper pentagon struts. 
The front of the wood needs to be flush with 
front of upper pentagon strut.

33' Doorway Installation

3 of 12

1

2

3

Make sure all hubs are properly aligned and tightened before starting.  
Temporarily attach Sloped Glazing Support across front of studs.  
This will keep wall level once it has been cut.  You will remove in 
Step 11.

3 ways to mark the door opening prior to cutting:
1. Transfer the marks made on the "B" Top Wall Plate.
2. Make marks to the inside of the doorway studs.
3. Measure opening according to doorway width (41")

Make sure "B" Base Strut is attached to the "B" Top Wall Plate outside
the area to be cut out. Cut "B" Base Strut with circular saw or sawzall.  
Then cut "B" Top Wall Plate with sawzall or handsaw. Sace cutouts for later use.

Use the cut out of either the "B" Top Wall Plate or
"B" Base Strut. Use a level to mark back edge of 
each of the upper pentagon struts.

mark

here

Bottom of FSP: 

With the assistant holding the top, hold the wood
to the side of the sawn edge of the "B" Base Strut and
lining it up with the front edge. Make a mark level with 
the top of the "B" Base Strut. 

Saw to this mark.

mark

mark

Locations of 
front sloping 
pieces.  

mark

here

Содержание Doorway

Страница 1: ...33 Doorway Installation 1 of 12 Doorway Installation Manual...

Страница 2: ...ort 33CRS 2 Planted Rafters 33PR 1 Ridge Support 33RS 1 Bottom Plate Extender 33BPE Cut out from foundation wall framing Never trim factory edge of glazing Wear eye and ear protection when cutting gla...

Страница 3: ...opening prior to cutting 1 Transfer the marks made on the B Top Wall Plate 2 Make marks to the inside of the doorway studs 3 Measure opening according to doorway width 41 Make sure B Base Strut is att...

Страница 4: ...is level set the Headers 2 2x4s on edge on the top of the door frame but do not attach Mark the location of the back Header Periodically check that the opening is square by measuring from the top lef...

Страница 5: ...f the Front Sloping Piece Attach Side Rafter Supports into Front Sloping Piece checking again for level Use 2 1 2 screws as shown 2 1 2 screws 3 screws Tie plate with tico nails 2 1 2 screws 3 screws...

Страница 6: ...and 5 more spaced evenly as shown At this time move on to Step 9 of the dome installation manual Foundation Wall Trim Strips Leave extra length on the Horizontal Trim 3 past the cut doorway opening a...

Страница 7: ...rds the exterior of the dome Attach to Horizontal Glazing Support with 4 1 1 2 ss screws Finish attaching bottom edge of Upper Pentagon Panels tape here bottom cap tape here Ridge 16 Begin by screwing...

Страница 8: ...crews as shown Ridge is sent long and will need to be trimmed in the field Reminder Predrill all screwholes Securing Ridge Predrill through tape to prevent tearing Using a 3 screw secure the angled en...

Страница 9: ...w through the glazing from the back using 1 1 2 ss screws Screw diagonally into the Ridge and Side Rafter Supports from the front using 2 1 2 screws Ridge Support The Ridge Support is sent long and ne...

Страница 10: ...ap on the glazing side edge of strip Note Roof Glazing not shown attached here to show the screw pattern for Left and Right Wall Glazing Panels 24 Bottom Plate Extender Attach Bottom Plate Extender Us...

Страница 11: ...ing Ridge and Joints The Door Front panels are sent wide and will need to be trimmed in field with a plywood blade Attach siding Door Fronts Use 1 1 2 ss screws Tape the ridge and joints where the gla...

Страница 12: ...Vertical Trim Strips between wall sections Finish attaching the Horizontal Trim Strip Trim so it ends at edge of siding Door Front Attach last Bottom Caps sent long trim to fit using tin snips Then a...

Отзывы: