background image

19

20

NOTICE:

NOTICE:

NOTICE:

selecting CT1 or electricity meter, please refer to section 6.4.4 for details.

•If the cable such as “CT1” cable is not used, please do not remove the filler plug from 

the cable support sleeve.

•CT  1  wire  (5m  in  length)  specification:  RJ45,  standard  LAN  line  (one  end  with  8P 

modular  plug,  the  other  connected  with  current  transformer).  But  if  the  length  is  not 

enough,  customer  can  add  cable,  so  the  length  can  be  increased  to  15m  max,  the 

operation is as follow Fig:

The meter and CT1 can't be installed at same time, please set the sensor model when 

 

During  the  actual  operation,  please  pay  attention  to  the  installation  of  current 

transformer as the diagram shows below:

Fig 5.26

Fig 5.25

As illustrated above, open the current transformer and you can see an arrow labeled on it 

indicating  the  direction  of  current.  Put  the  live  wire  among  the  under-detection  wires 

onto the current transformer. After latching the current transformer, the installation has 

been finished.

The direction of the arrow on the current transformer is corresponding to the direction of 
the current in live wire from grid to the load. Current transformer needs to be placed in 
the power distribution cabinet.

5.4.5 Connection of meter terminal

We also can use meter instead of CT1 in SPA series to monitor the power consumption 

situation of 

residential users, the meter terminal connection steps are as follows:

•Reference 5.2, make LAN cables with RJ45 terminal.

•Thread the swivel nut over the LAN cable.

•Press the cable support sleeve out of the cable gland.

•Remove the filler plug from the cable support sleeve.

•Route the LAN cable through an opening in the cable support sleeve.

•Thread the LAN cable through the cable gland.

•Insert  the  RJ45  plug  of  the  network  cable  into  the  “Meter”  pin  connector  on  the 

inverter until it snaps into place.

•If no other cables need to be installed, lock the waterproof cover to the inverter with 

screws.

•Screw the swivel nut onto the waterproof cover.

Fig 5.27

Fig 5.28

selecting CT or electricity meter, please refer to section 6.4.4 for details.

•Meter must be provided by Growatt. If not, maybe meter can't communicate with SPA 

series.

•The more detail describe of meter installation, please turn to meter user manual

Meter  and  CT  can't  be  installed  at  same  time,  please  set  the  sensor  model  when 

 

Содержание SPA 1000TL BL

Страница 1: ...52 A 00 SHENZHENGROWATTNEWENERGYTECHNOLOGYCO LTD No 28GuangmingRoad ShiyanStreet Bao anDistrict Shenzhen P R China T 86 755 27471942 E service ginverter com W www ginverter com Installation Operation...

Страница 2: ...w 2 2 Symbols Explanation 3 1 Function 3 2 Models 3 3 Apperance 3 4 Dimensions 3 5 Nameplate 3 6 Storage 3 Product Introduction 4 Unpacking 5 Installation 5 1 Basic Installation Requirem ents 5 2 Tool...

Страница 3: ...nverter 12 4 Disposing of the SPA Inverter 13 1 SPA Series Energy Storage Machine Product Specification 13 2 Torque 13 3 Appendix 6 Commissioning 12 Decommissioning 7 Start up and Shut Down SPA System...

Страница 4: ...t must be operated by a trained professional electrical technician and adhere to this manual Be sure to disconnect the battery and Grid for at least 5 minutes before operation to avoid danger Please p...

Страница 5: ...cable CE guidelines 4 3 Product Introduction 3 3 1 Function 3 2 Models 3 3 Apperance SPA series are the AC Coupled inverter which can store energy into battery with or without existing grid tied inver...

Страница 6: ...ies 474 428 178 590 17 Nameplate contains the following information Take SPA3000 as an example Table 3 1 Table 3 2 Fig 3 2 Fig 3 3 place The stored temperature range is 25 C 60 C storage humidity rang...

Страница 7: ...ze of the SPA series Do not install the inverter on a building constructed of flammable or non heat resistant materials SPA series s degree of protection is IP65 and can be installed indoors or outdoo...

Страница 8: ...es on the wall Fig 5 4 Fig 5 5 Fig 5 6 Table 5 1 LAN line RJ45 sequence as follow PIN 1 2 3 4 Color White orange Orange White green Blue PIN 5 6 7 8 Color White blue Green White brown Brown LAN line 1...

Страница 9: ...top edge of paper board is level As the chart 5 8a below Mark four points at the wall via the hole of the paper board then remove the paper board Drill four 8 holes at the mark point the depth is not...

Страница 10: ...in sequence insert cables into connection terminal according to polarities indicates on it and tighten the screws Table 5 3 Fig 5 10 Fig 5 11 Fig 5 12 Step 3 Push threaded sleeve on to connection term...

Страница 11: ...connect with AC grid and EPS OUTPUT like the chart show AC grid terminal and EPS terminal can t directly connect together EPS terminal can t connect to grid If you want to use on gird and off grid you...

Страница 12: ...the cable such as CT2 cable is not used please do not remove the filler plug from Fig 5 21 During the actual operation please pay attention to the installation of current transformer as the diagram sh...

Страница 13: ...to the direction of the current in live wire from grid to the load Current transformer needs to be placed in the power distribution cabinet 5 4 5 Connection of meter terminal We also can use meter in...

Страница 14: ...ttery manual If the cable such as RS485 cable or CAN cable is not used please do not remove the filler plug from the cable support sleeve If you are using a lead acid battery you do not need to instal...

Страница 15: ...th of this cable is 1 5m so pay attention to the distance of battery and SPA series If the cable such as NTC lead acid battery temperature sensor cable is not used please do not remove the filler plug...

Страница 16: ...ate power DRM6 2 5 Do not generate at more than 50 of rated power DRM7 3 5 Do not generate at more than 75 of rated power and sink reactive power if capable DRM8 4 5 Increase power generation subject...

Страница 17: ...r export to the grid With inverter energy from inverter inverter is weak the battery will discharge for load firstly and the grid will supply the power when the battery power is not enough Without inv...

Страница 18: ...ase refer to 9 1 6 2 2 Fault mode 6 2 4 Checking mode 6 2 5 Standby mode 6 2 6 Shutdown mode 6 2 3 Programming mode Programming mode indicate the SPA is updating don t cut out power Grid and Battery w...

Страница 19: ...the model display show as 6 3 1 If the model display is match what you want it means your setting is successful 2 You need to calibrate the time that the machine is showing after SPA series starts up...

Страница 20: ...ON 5 4 2 3 1 ON 5 4 2 3 1 ON 5 4 2 3 1 ON 5 4 2 3 1 ON 5 6 4 Display and button 6 4 1 LCD display area Vb Cb 50V 40 Normal Location Description A Information B State C SPA inverter D Power flow line E...

Страница 21: ...will be in stopped operational protection state The B line s information as follow In normal it will turn on page automatically when pushing the button UP the order of the paging information as follow...

Страница 22: ...ou can see the setup options below after pressing Enter for 1S In the back up you can set EPS including enable or disable default is enable AC voltage default is 230V and frequency default site 50HZ U...

Страница 23: ...ow Program OK and inverter will back to normal working state Then pull out the U disk and screw the waterproof lid 6 5 Communication 6 5 1 U disk Firmware upgrade USB is only used for firmware update...

Страница 24: ...ion optional WiFi connection steps Remove the RS232 port cover turn the small DIP switch Pin1 and Pin2 to ON Plug WiFi S module into the RS232 port and configure the connection between WiFi module and...

Страница 25: ...disconnecting battery terminals Determine if battery is inadvertently grounded If inadvertently grounded remove source from ground Contact with any part of a grounded battery can result in electrical...

Страница 26: ...C V Outrange Grid voltage fault Please refer to the local grid standard for more details of the grid voltage 1 Make sure AC voltage is in the range of local standard 2 Make sure the AC cable is well c...

Страница 27: ...tput voltage low 1 Check the load of EPS If overload occurred at the same time reduce EPS load 2 Restart inverter again Error message Error message Description Suggestion Error 411 I n t e r n a l c o...

Страница 28: ...ibed in this document are in compliance with the above mentioned EU directives The entire EU Declaration of Conformity can be found at www ginverter com The factory warranty card is enclosed with the...

Страница 29: ...s between 25 C and 60 C Do not dispose of SPA inverter together with household waste Please accordance with the disposal regulations for electronic waste which apply at the installation site at that t...

Страница 30: ...y 92 0 92 5 93 0 Max Discharge efficiency 92 5 93 0 93 5 Protection Devices BAT reverse protection yes AC surge protection yes AC short circuit protection yes Ground fault monitoring yes Grid monitori...

Страница 31: ...06100 Shine Wi Fi S COM interface MR00 0008600 GRRS COM interface MR00 0009601 SP CT Wireless meter sensor MR00 0006500 SPM Single phase meter Rs485 meter sensor of Eastron MR00 0008800 13 2 Torque 13...

Страница 32: ...e technical problems about our products contact the Growatt Service line or dealer We need the following information in order to provide you with the necessary assistance SPA inverter Serial number SP...

Отзывы: