background image

3.3.1 RS485 cable connection 

3  

Installation and Connection

3.1 ShineMaster installation environment requirements

The installation environment requirements of ShineMaster and communication with 
other devices:
(1) Indoor installation, temperature - 40 ~ 60

 , avoid moisture and direct sunlight.

(2) Cable RS485 in maximum 500m.
(3) The standard version :The length of communication cable to the switch or router is 
      not more than 100m

(4) The 4G version: Using 4G communication mode, must connect to 4G antenna, insert 

      the 4G sim card.

3.2 ShineMaster installation

3.2.1 Installation Procedure

The installation steps are as follows

:

Install ShineMaster on a vertical surface or horizontal surface.

Connect cables between RS485 port and RS485 port on ShineMaster (please refer to 

      3.3.1 below for details)

(1) 

(2) 

(3) Communication mode options

      The standard version: Connect the network cable 

      The 4G version: Connect 4G antenna, insert the 4G sim card.

(4) Connect the Power supply 

3.3 Connect to the photovoltaic device

ShineMaster can communicate with the inverter, weather station, smart meter, combiner 

box and other photovoltaic devices to collect the data.

1.ShineMaster (leader) communicates with follower devices via RS485 wired connection. 
T+ on the RS485 port of the device corresponds to A1 or A2 on the ShineMaster 485 
port, T- and ShineMaster 485 on the RS485 port of the follower device, corresponding to 
B1 or B2. The following is a schematic diagram of the connection between the 
ShineMaster and the inverter:
Note: the RS485 shielded wire must be ground (PE) for long distance communication, so 
as not to affect the communication stability. 

8

9

Содержание ShineMaster

Страница 1: ...User Manual SHENZHEN GROWATT NEW ENERGY TECHNOLOGY CO LTD 86 755 2747 1942 86 755 2747 2131 service ginverter com www ginverter com T F E W No 28 Guangming Road Shiyan Street Bao an District Shenzhen...

Страница 2: ...nstallation 3 3 Connect to the photovoltaic device Installation and Connection CONTENT ShineMaster internal page parameter setting 2 1 Device Overview 2 2 Unpacking 2 3 ShineMaster Network Introductio...

Страница 3: ...ped and produced by Shenzhen Growatt New Energy Co Ltd hereinafter referred to as Growatt We sincerely hope that this product will meet your needs and expect you give more opinions on the performance...

Страница 4: ...ve wireless signals B KEY Reset button C POWER Power supply port D SIM SIM card slot E ANT1 Rf antenna interface N LAN RJ45 port Connect Shine ShineMaster to the local network area of Shine Server thr...

Страница 5: ...unavailable K 4G 4G signal indicator L Status light The LED light is flashing when there is a error table 2 2 2 2 Unpacking 2 2 1 Packing List Check ShineMaster and accessories are intact and complete...

Страница 6: ...oad the monitored data to the server of Growatt and then access the server s domain name with the industrial common communication mode RS485 and wireless RF communication ShineMaster can also supports...

Страница 7: ...ort and RS485 port on ShineMaster please refer to 3 3 1 below for details 1 2 3 Communication mode options The standard version Connect the network cable The 4G version Connect 4G antenna insert the 4...

Страница 8: ...res Take an example with TP_LINK router 1 Get in the router management page 2 Click on the DHCP server client list 3 Find the same as the serial number of the collector SN the client name This IP is t...

Страница 9: ...ent it is necessary to enter the ShineMaster Data Collector Settings page of the internal page to add devices 2 In the second pull down list select the type of monitored device 12 13 Device types para...

Страница 10: ...hod for monitoring PV devices in the first drop down list of Add or Remove Devices 2 In the second pull down list select the type of PV plant being monitored 3 Fill in the PV device communication addr...

Страница 11: ...he momemet you add this device like 485 channel device type address if you are not sure about this you can check the device status first 2 When one address is occupied you cannot just paste the new de...

Страница 12: ...hoose two methods one is IP and one is domain name you can only use one at a time when you are using the domain name to connect server you can choose on at Domain Name Analysis Function set the server...

Страница 13: ...the first time register the user name first Enter the domain name access page as shown in Figure 5 1 The Chinese user server domain name is http server cn growatt com The overseas user server domain...

Страница 14: ...logger check code can be found on the package box Fig 5 2 5 2 Monitoring data 1 After the registration is completed it will automatically skip to the ShineServer main interface Click plant plant data...

Страница 15: ...d Box MAX 24 25 5 3 Add or Delete Monitoring devices change the ShineMaster Baud rate 5 3 1 Add or Delete Monitoring device 1 In the Server page click the Device Management and then click Data Logger...

Страница 16: ...ill pop out 5 3 2 Change ShineMaster Baud rate 1 In the Server page click Device Management then click Data Logger click the Baud rate setting icon 2 Set chosen channel s baud rate 3 If success follow...

Страница 17: ...e 2 Enter the internal page datalogger settings to add photovoltaic devices 3 On the Device Status page of the internal page check whether the device s communication address is the same with the added...

Страница 18: ...ame SHENZHEN GROWATT NEW ENERGY TECHNOLOGY CO LTD Address No 28 Guangming Road Shiyan Street Bao an District Shenzhen P R China Customer Service Hotline 86 755 27471942 E mail service ginverter com Co...

Отзывы: