Debugging 7
1. Close the DC switch on the inverter. As long as the input DC voltage is greater than 140V,the
inverter display will show the following information: No mains connection error,the inverter LED will
turn red.
If other information is displayed, please refer to Chapter 13.If you encounter any problems during
the debugging process and cannot solve it,please contact customer service.
2. Close the circuit breaker or switch between the inverter and the grid, the inverter will start a
countdown to the self-check,and after the self-check is normal,it will be connected to the grid.
3.In normal operation.the leaves of the inverter indicator window will turn green.
4.Finish debugging.
28
Содержание MOD 10KTL3-XH
Страница 1: ...Asennus ja k ytt ohje...
Страница 19: ...Kuva 5 9 Kaaviokuva invertterin sein asennuksesta...
Страница 57: ...Installations och bruksanvisning...
Страница 75: ...Figur 5 9 Schema f r v ggmontering av v xelriktaren...
Страница 113: ...Operation Manual Installation...
Страница 131: ...Fig 5 9 Schematic diagram of inverter wall mounting...
Страница 169: ......