background image

E

A
B
C

under any condition! Make sure the maximum open circuit voltage (Voc) 
of  each  PV  string  is  less  than  450  VDC  for  Growatt  1000,Sunglod 
1000,The length of input wire must be less than30m.

Use  H4  or  MC4  (Multi-contact)  connectors  for  PV  array  terminals.  Make 
sure DC switch is off before connecting.

Connect the positive negative terminals from the PV panel to positive (+) 
terminals and negative (-) terminals on the PV-Inverter. Each DC terminal 
on Inverter can withstand 20ADC.

Before  connecting  PV  panels  to  DC  terminals,  please  make  sure  the 
polarity  is  correct.    Incorrect  polarity  connection  could  permanently 
damage the unit. Checks short-circuit current of the PV string. The total 
short-circuit  current  of  the  PV  string  should  be  less  than  the  inverter’s 
maximum DC current.

High  voltages  exist  when  the  PV  panel  is  exposed  to  the  sun  .To  reduce 
risk  of  electric  shock,  avoid  touching  live  components  and  treat 
connection terminals carefully.

D

2.4

 

Connect to PV panel (DC input)

2.5 Checking

6

7

2.5.1 Country selecting

When  the  PV  panels  are  connected  and  their  output  voltage  is  greater  than  70Vdc 
but the AC grid is not yet connected, inverter will start up automatically. If it is the 
first time to power on the inverter after installation, you may need to select a specific 
country*  .Otherwise,  the  interface  will  stay  at  the  ‘Please  Select’  interface  all  the 
time. There are eleven options to select, as the list below.

Country/Regulation Name

options

VDE0126-1-1

Germany

UK_G83

Italy

France

Denmark

Belgium

Spain

Greece

Turkey

Hungary

// 

0

// 

1

// 

2

// 

3

// 

4

//

 

5

// 

6

// 

7

// 

8

// 

9

// 

10

Note:

 1.If the country you want to select is not in the above list, please directly select

VDE0126-1-1.

2.The inverter can only be used for single grid-connected in the area where CEI 0-21 
and VDE-AR-N4105 are requested to accord. 

Please finish the country selecting according to the following steps:

The  LCD  will  quickly  switch  to  and  stay  at  the  ‘Please  select’  interface 
after power on, as Fig 2-5-1.

A

Single  knock  on  the  LCD,  countries  will  vary  from  one  to  another  along 
the  above  list  order.  Fig  2-5-2  acts  as  an  example,  and  Germany  is  the 
second selection.

B

Fig 2-5-1

Fig 2-5-2

*

If  you  have  ordered  the  inverter  with  specific  country  settings,  the  parameters  have  been  preset  in  factory 
and you don't need to operate this step any more.

Содержание Grid

Страница 1: ...service ginverter com GR UM 001 09 GROWATT NEW ENERGY CO LTD No 28 Guanghui Road Longteng Community Shiyan Baoan District Shenzhen P R China ...

Страница 2: ...irst check this manual before contacting your local dealer or representative Instructions inside this manual will help you solve most installation and operation difficulties CONTRNT INSTALLATION 2 1 Installation manual 2 2 Fixed on the wall 2 3 Connect to the grid AC utility 2 4 Connect to PV panel DC input 2 5 Checking 2 6 System diagram MODES OF OPERATION 3 1 Normal mode 3 2 Fault mode 3 3 Shutd...

Страница 3: ...el is exposed to light it generates a DC voltage When connected to this equipment a photovoltaic panel will charge the DC link capacitors Energy stored in this equipment s DC link capacitors presents a risk of electric shock Even after the unit is disconnected from the grid and photovoltaic panels high voltages may still exist inside the PV Inverter Do not remove the casing until at least 10 minut...

Страница 4: ...e upper straps of PV Inverter and ensure it fits on to the bracket Insert safety lock screws to the bottom leg to secure the inverter image 3 Check the secure mounting of the PV Inverter by trying to raise it from the bottom The PV Inverter should remain firmly attached Select the installation location so that the status display can be easily viewed Choose a strong mounting wall to prevent vibrati...

Страница 5: ...cted and their output voltage is greater than 70Vdc but the AC grid is not yet connected inverter will start up automatically If it is the first time to power on the inverter after installation you may need to select a specific country Otherwise the interface will stay at the Please Select interface all the time There are eleven options to select as the list below Country Regulation Name options V...

Страница 6: ...ctful please contact Growatt for specific software to clear and reset again When the selection is successful the inverter will reboot automatically 2 5 2 Commissioning After the inverter reboot LCD will produce the following messages in order Ser NO xxx xxxxx FW version Waiting No AC connection the display repeats NO Utility and LED will be red Close the AC breaker or fuse between PV Inverter and ...

Страница 7: ...t controller can continuously monitor and adjust the system status If Inverter finds any unexpected conditions such as grid problems or internal failure it will display the information on its LCD and the LED will be red 3 3 Shutdown mode During periods of little or no sunlight Inverter automatically stops running In this mode Inverter does not take any power from the grid The display and LED s on ...

Страница 8: ...RK 1 2 3 4 5 6 7 8 9 10 11 12 13 Etoday xx x KWh Eall xxx x KWh Tall xx x h PV xxx xxx B xxx AC xxxV F xx xHz SerNo xxxxxxxxxx Module PX UX MX SX FW version x x x Enable Auto Test Set Language Set LCD Contrast System F XXHz COM address xx 4 4 4 4 4 4 4 4 4 4 4 4 4 The energy today The total energy The total work time The PV1 PV2 voltage The AC voltage and frequency The serial number The inverter m...

Страница 9: ...ndly therefore the status of the Inverter can be easily understood by reading the information shown on the front panel display All possible messages are shown in the following table DISPLAY OPERATION Auto Test Failed No AC Connection PV Isolation Low Residual I High Output High DCI PV Voltage High AC V Outrange AC F Outrange System fault Auto test do not pass No utility no grid connect Insulation ...

Страница 10: ...eters 5 In Wave Data Interface Query the inverter real time and history power wave work data and error information 6 Multi languages English Simple Chinese French German Spanish and etc Support OS WinXP Vista win7 2000 2003 5 2 Monitor After setting the software the user can monitor the inverter The right side of the main interface is the detailed information of inverter 5 3 Detailed information D...

Страница 11: ...g net plug RS485 terminals into the inverter tight waterproof connector lock waterproof device onto the inverter Note As to the connection between inverters please refer to the following figure 1 2 3 RS485 terminal of the inverter Com port of Shine WebBox RS 485 terminal of the inverter 1 1 2 3 1 2 3 RS 485 terminal of the inverter 2 1 2 3 1 2 3 As to the connection between inverter and Shine WebB...

Страница 12: ...he panel please check PV input connections If the voltage is higher than 90V call your local service During periods of little or no sunlight the PV Inverter may continuously start up and shut down This is due to insufficient power generated to operate the control circuits Specifications 7 Input Data Max input current per string Max DC voltage Max DC power PV voltage range MPP voltage range Number ...

Отзывы: