![Growatt AXE 5.0L Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/growatt/axe-5-0l/axe-5-0l_quick-installation-manual_2270431002.webp)
Installation Procedure
6-2
Note
:
When stacking, make sure that all batteries are aligned and lock the safety bolt.
Note
:
1.The battery base is required while installing the battery system .
2. The maximum quantity of stacking battery pack is 10, if it exceeds 10, please install them by
the way of multiple clusters in parallel.
3. Please install indoors and ensure the level of the ground.
1
5
0
m
m
≤
d
≤
5
0
0
m
m
3
2
4
Installation Location Requirements
6.Floor installation with base
6-1
Wall
≥
150mm
≥
150mm
90
°
90
°
Ground
Ground
Ground(2
~
8 clusters installation)
5.Battery operation panel introduction
. . .
Cluster 1
Cluster 2
Cluster 8
1
5
0
m
m
≤
d
≤
5
0
0
m
m
Cluster 3
1
2
3
4
5
6
7
8
9
10
11
Fault light
SOC light
Power button
Negative terminal
Positive terminal
Communication between battery packs
of single cluster
USB interface
Link-out for multi-cluster in parallel communication
Link-in for multi-cluster in parallel communication
PCS CAN communication
GND terminal
1
2
3
4
5
6
7
8
9
10
11
7.Wiring
Single cluster wiring
7-1
Battery-
PE
CAN communication
AXE 5.0L Cable
To PCS
Note:
1) Please install the communication line first, then plug the unused RJ45 port and
USB port with a dust cover, and finally install the power line.
2) No cable connection required between battery packs in a single battery cluster.
RJ45 dust cover
USB dust cover
PC
S
PC
S
Press down
PC
S
Check accessories
4-2
AXE 5.0L Base
(Any of them)
AXE 5.0L
A
B
AXE 5.0L Cable
Installation Method
Compound Mode
C
A*M+B+C
Standard floor installation
Floor installation into N columns
A*M+B*N+C*N
(2000
±
25)mm
RJ 45 dust cover
USB dust cover
Note
:
"M" means the number of batteries, "N" means the number of clusters.