manualshive.com logo in svg
background image

35

36

Load supply source: 

When PV power is available: 

1. 1st PV, 2nd Battery, 3rd Grid

PV power will provide power to the load first. If it’s not sufficient, battery power will 
provide power to the load. When battery power is running out or not available, grid 
will back up the load.

2. 1st PV, 2nd Grid, 3rd Battery

PV power will provide power to the load first. If it’s not sufficient, grid will provide 
power to the load. If grid is not available at the same time, battery power will back 
up.

When PV power is not available:

1.

 

1st  Grid,  2nd  Battery:  Grid  will  provide  power  to  the  load  at  first.  If  grid  is  not 

available, battery power will provide power backup.

2.

 

1st  Battery,  2nd  Grid:  Battery  power  will  provide  power  to  the  load  at  first.  If 

battery power is running out, grid will back up the load.

NOTE: This option will become ineffective during AC charging time and the priority 
will  automatically  become  1st  Grid  and  2nd  Battery  order.  Otherwise,  it  will  cause 
battery damage. 

·

Grid-tie with backup (IV): Users are only allowed to set up peak time and off-peak 

electricity demand.

Working logic under peak time: 

PV energy supply priority: 1st Load, 2nd Battery and 3rd Grid

PV power will provide power to the load first. If PV power is sufficient, it will charge 
battery next. If there is remaining PV power left, it will feed-in to the grid. Feed-in to 
the grid is default disabled. 

Battery charging source: PV only

Only  after  PV  power  fully  supports  the  load,  the  remaining  PV  power  is  allowed  to 
charge battery during peak time. 

Load supply source: 1st PV, 2nd Battery, 3rd Grid

PV  power  will  provide  power  to  the  load  first.  If  PV  power  is  not  sufficient,  battery 
power  will  back  up  the  load.  If  battery  power  is  not  available,  grid  will  provide  the 
load.  When  PV  power  is  not  available,  battery  power  will  supply  the  load  first.  If 
battery power is running out, grid will back up the load.

Working logic under off-peak time:

PV energy supply priority: 1st Battery, 2nd Load and 3rd Grid 

PV power will charge battery first. If PV power is sufficient, it will provide power to 
the loads. The remaining PV power will feed to the grid.

NOTE: The max. feed-in grid power setting is available in parameter setting. Please 
refer to software manual.

Battery charging source:

PV power will charge battery first during off-peak time. If it’s not sufficient, grid will 
charge battery. 

Load supply source: 1st PV, 2nd Grid, 3rd Battery

When  battery  is  fully  charged,  remaining  PV  power  will  provide  power  to  the  load 
first.  If  PV  power  is  not  sufficient,  grid  will  back  up  the  load.  If  grid  power  is  not 
available, battery power will provide power to the load. 

 PV and grid charge battery

Figure 14.6

Содержание 10000HY

Страница 1: ...TECHNOLOGY Co LTD 86 755 2747 1900 86 755 2747 2131 info ginverter com www ginverter com T F E W Growatt 10000HY Installation Operation Manual No 28 Guangming Road Shiyan Baoan District Shenzhen P R C...

Страница 2: ...2 Connecting to the AC output Dry Contact Signal 10 9 10 1 Electric Parameter 10 2 Function Description Communication Relay Control Port 11 11 1 Interface Configuration 11 2 Function Description 11 3...

Страница 3: ...V modules to the inverter Do not connect the positive or negative terminal of the solar panel to the ground See Figure 1 for a simple diagram of a typical solar system with this hybrid inverter Note a...

Страница 4: ...ury to persons Use only recommended accessories from installer CAUTION cooling fan To reduce risk of fire hazard do not cover or obstruct the CAUTION been dropped or otherwise damaged in any way If th...

Страница 5: ...spect the unit Be sure that nothing inside the package is damaged You should have received the following items inside of package Inverter unit PV connectors AC connector Mounting plate Fixing screws S...

Страница 6: ...area that is dry free of excessive dust and has adequate air flow Do NOT operate it where the temperature and humidity is beyond the specific limits Please check the specs for the limitations Install...

Страница 7: ...ghtening torque is 35 N m 3 Fix the inverter in position by screwing the supplied two screws M4 12 located on the top two sides of the inverter 2 Raise the inverter and place it over the mounting plat...

Страница 8: ...e Clip Sealing nut Protective element Socket element Step 1 Check the grid voltage and frequency with an AC voltmeter It should be the same to VAC value on the product label Step 2 Turn off the circui...

Страница 9: ...modules To avoid any malfunction do not connect any PV modules with possibility of leakage current to the inverter For example grounded PV modules will cause leakage current to the inverter When using...

Страница 10: ...elow charts Insert assembled cable into male connector housing as shown below charts Then use spanner to screw pressure dome tightly to female connector and male connector as shown below Step 2 Discon...

Страница 11: ...W Battery Connection 7 CAUTION breaker between inverter and batteries NOTE1 Please only use sealed lead acid battery vented and Gel battery Please check maximum charging voltage and current when first...

Страница 12: ...tallation WARNING It s very important for system safety and efficient operation to use appropriate cable for AC connection To reduce risk of injury please use the proper recommended cable size as belo...

Страница 13: ...nnect load to AC Output Connector Do NOT Communication 9 The inverter is equipped with several communication ports and it is also equipped with a slot for alternative communication interfaces in order...

Страница 14: ...nit Status Condition Dry contact port NO C NC C Power Off Power On Unit is off and no output is powered Battery voltage is lower than setting battery cut off discharging voltage when grid is available...

Страница 15: ...4 shown as below charts 11 2 Function Description Unit status Condition Output voltage from relay control port Power Off Power On Unit is off and no output is powered When the unit is working at inver...

Страница 16: ...er circuit breaker and DC circuit breaker are installed correctly Step 2 Switch on the battery circuit breaker and then switch on PV DC breaker After that if there is utility connection please switch...

Страница 17: ...on is selected in PV energy supply priority the inverter is only operated between two working logics based on defined peak time and off peak time of electricity Only peak time and off peak time of ele...

Страница 18: ...e with backup II or Grid tie with backup III modes Allow battery to feed in to the Grid when PV is unavailable This option is only valid in all options of Grid tie with backup mode Grid tie with backu...

Страница 19: ...en PV power is not available 1 1st Grid 2nd Battery Grid will provide power to the load at first If grid is not available battery power will provide power backup 2 1st Battery 2nd Grid Battery power w...

Страница 20: ...ficient it will charge battery next If there is remaining PV power left it will feed in to the grid Feed in to the grid is default disabled Battery charging source PV only Only after PV power fully su...

Страница 21: ...wed to charge battery no matter it s PV power or grid Load supply source When PV power is available 1 1st PV 2nd Battery 3rd Grid Default PV power will provide power to the load first If it s not suff...

Страница 22: ...up 1st Battery 2nd Load When PV power is not available 1 1st Grid 2nd Battery Grid will provide power to the load at first If grid is not available battery power will provide power backup 2 1st Batte...

Страница 23: ...ry power will provide power to the load at first If battery power is running out grid will back up the load NOTE This option will become ineffective during AC charging time and the priority will autom...

Страница 24: ...ime or the date and time users set for querying energy generation Indicates solar panels Icon flashing indicates PV input voltage or is out of range Indicates utility Icon flashing indicates utility v...

Страница 25: ...ode NOTE error occurs the buzzer will continuously sound You may press any button to mute it If backlight shuts off you may activate it by pressing any button When an 15 4 Query Menu Operation The dis...

Страница 26: ...ds and then feed in to the grid PV power is sufficient to charge the battery first However remaining PV power is not sufficient to back up the load Therefore remaining PV power and the utility are sup...

Страница 27: ...ithout grid connected This inverter is working with DC INV operation and not connecting to the grid LCD Display Description PV power is sufficient to charge battery and provide power to the connected...

Страница 28: ...to 200Amp It can be adjusted via software from 50Vac to 60Vdc It can be adjusted via software from 50Vac to 60Vdc Charging process based on default setting 3 stages First max charging voltage increas...

Страница 29: ...ery packs The following precautions should be observed when working on batteries a Remove watches rings or other metal objects b Use tools with insulated handles c Wear rubber gloves and boots d Do no...

Страница 30: ...tery under voltage when grid is OK Solar over voltage Battery discharges to shutdown point Battery is unconnected or too low Battery stops discharging when the grid is OK PV voltage is too high 18 2 F...

Страница 31: ...e inverter 2 If the error message still remains please contact your installer 34 INV voltage high Internal components failed Please contact your installer 35 Wire connection fault Internal wires loose...

Страница 32: ...DC Voltage Maximum Battery Discharging Current Maximum Charging Current PHYSICAL 622 x 500 x 167 2 45 Dimension D X W X H mm Net Weight kgs GENERAL INTERACE RS 232 USB Optional SNMP Modbus and AS 400...

Отзывы: