background image

www.gronomics.com 

East Bethel, MN USA 

763-753-7374

End Rail Assembly

Install two 31” x 5-1/2” side rails (Item 2) into the slots 
and slide to the bottom of the slots.

2

Final Side Rail Assembly

4

Install the remaining 31” x 5-1/2” side rails (Item 2) into the 
slots and slide down.

Flip the garden bed right side up.

NOTE: Ground preparation is optional. It is recommended 
to level an area under the frame of the garden bed before 
placing the garden bed and 

fi

 lling with soil.

Soil Capacity: 8.6 Cubic Feet

2

2

3

2

Garden Bed Right Side Up

Logo

Отзывы: