background image

www.gronomics.com 

East Bethel, MN USA 

763-753-7374

5

Bottom Board and Fabric Installation

Place one 31” x 

4

-1/2” corner notched bottom board (Item 4) on 

each end of the garden bed.

Place four 31” x 5-1/2” bottom boards (Item 5) into the garden bed. (Gap 
boards evenly to allow for water drainage).

Place fabric liner into the garden bed.

Soil Depth: approximately 12-1/2”

Soil Capacity: 8.6 Cubic Feet

3

Side Rail Assembly (Continued)

Install two 31” x 5-1/2” side rails (Item 3) into the slots and slide down to 
the bottom of the slots.

4

5

6

Post Cap Assembly

Remove the rubber cap from the corner posts studs.

Align the hole of the 4” x 4” post cap (Item 6) with stud and tighten until 
the cap makes contact with the post.

NOTE: Do not overtighten.

Repeat procedure on all posts.

Rubber Cap

Stud

6

4

Final Side Rail Assembly

Install eight remaining 31” x 5-1/2” side rails (Item 3) one w/Logo into the 
slots on each side of the garden bed and slide down.

NOTE: Make sure the boards tongue and grooves fully seat together.

3

Logo

3

3

3

Отзывы: