Gronomics EGB 18-34 Скачать руководство пользователя страница 2

www.gronomics.com 

East Bethel, MN USA 

763-753-7374

Install two 14” x 5-1/4” side rails (Item 3) (with the groove down) into the 
slots and slide down to the bottom of the slots.

6

Bottom Board and Fabric Installation

Place one 15” x 5-1/2” corner notched bottom board (Item 7) on each 
end of the garden bed.

Place six 15” x 5-1/2” bottom boards (Item 8) into the garden bed. (Gap 
boards evenly to allow for water drainage).

Place fabric liner into the garden bed.

Soil Depth: approximately 12-1/2”

Soil Capacity: 3 Cubic Feet

3

End Rail Assembly

3

3

7

8

4

Narrow Center Side Rail Assembly

Install two 31” x 2-1/2” side rails (Item 4) into the slots on each side of 
the garden bed and slide down.

Install two 14” x 2-1/2” side rails (Item 5) into the slots on each end of 
the garden bed and slide down.

4

5

5

5

Final Side Rail Assembly

Install two 31” x 5-1/4” side rails (Item 6) (one with Logo) into the slots 
on each side of the garden bed and slide down.

Install two 14” x 5-1/4” side rails (Item 3) into the slots on each end of 
the garden bed and slide down.

Logo

6

3

3

7

Post Cap Assembly

Remove the rubber cap from the corner posts studs.

Align the hole of the 4” x 4” post cap (Item 9) with stud and tighten until 
the cap makes contact with the post.

NOTE: Do not overtighten.

Repeat procedure on all posts.

Rubber Cap

Stud

9

Отзывы: