Application

Self closing mixers with thermostat are designed for hot water 
supply via pressurized storage heater and utilized in this way 
to provide the best temperature accuracy. With sufficient 
power (from 18 kW or 250 kcal/min) electric or gas instan-
taneous heaters are suitable.
Thermostats 

cannot

 be used in connection with low pressure 

storage heaters.
All thermostats are adjusted in the plant at a flow pressure on 
both sides of 3 bar.
If temperature deviations should exist due to special instal-
lation conditions, then the thermostat is to be adjusted to the 
local conditions (see Adjustment).

Specifications

Minimum flow pressure without downstream
resistances 0,5 

bar

Minimum flow pressure with downstream
resistances 1 

bar

Operating pressure

 

 max. 10 bar

Recommended flow pressure 

1 - 5 bar

Test pressure

 

10 bar

Flow rate at 3 bar flow pessure without 
downstream resistances: 

approx. 15 l/min.

Temperature
Hot water inlet:  

 

max. 70 °C

Recommended (energy saving):  

60 °C

Hot water end-stop

35 °C - 45 °C

Hot water temperature at supply connection min. 2 °C 
higher than mixed water temperature

Supply voltage:

6 V-Lithium battery (Type CR-P2)

Running time: 

       2 - 1800 s (30 min.)

Watercourse infinitely variable from 2 - 180 s
Increase of water flow time by a factor of ten possible
(factory setting 15 s)

Automatic safety stop after 180 s

Pulsating water jet early indicates battery change 

Type of protection:

IP 55

 Water connection 

cold - right

hot - left

  Minimum flow rate 

= 5 l/min

Special accessory, 

see spare parts fold-out page I.

Socket wrench adjustment (ref.-no.: 47 763). 

Thermoelement cartridge for reversed connection, cold left - 
hot right, (ref.-no.: 47 657).

Special wrench (ref.-no.: 19 070) for dismounting 
seat (01 460).

Special wrench (ref.-no.: 19 132) for dismounting flexible 
hoses.

Permission and conformity

The agreement assertions can be requested under the 
following address:

GROHE Deutschland Vertriebs GmbH

Zur Porta 9
D-32457 Porta Westfalica

Disposal note

Dispose of batteries in accordance with national 
regulations.

Installation

Plaster and tile the wall, excluding the area occupied by the 
installation protection.
1. Unscrew screws (A) and keep for mounting retaining cover, 

see fold-out page II, Fig. [1].

2. Cut off rough installation protection (B) tile-justified.
3. Fasten retaining cover (C) with screws (A), (C1) and 

washer (C2) through the rough installation protection at the 
installation box (D), see Fig. [2].

4. Fasten protection chain (E) of retaining cover (C) at cover 

plate (G), see Fig. [3].

5. Connect hose (H) to cold water isolating valve (H1), 

see Fig. [4].

6. Connect hose (J) to cold water isolating valve (J1).
7. Connect hose (K) to shower connection (K1).

Open isolating valves and check connections for leakage!

Final installation

1. Engage wall plate (G) in the support frame (C) from above 

then press it in and down, see Fig. [5].

2. Fasten wall plate (G) with screw (G1) using the allen key 

supplied. 

Operation

After pressing the operation cap (L) the water flow releases for 
the factory set running time of 15 s, see Fig. [6].
After run off of the adjusted time the valve stops the water flow 
independently and without recoil. 

Setting the running time (2 - 180 s)

To change the running time please proceed as follows:
1. Activate adjusting mode by pressing the operation cap (L), 

see Fig. [6].

2. Hold operation cap pressed, the water flow starts 10 s after 

pressing.

3. Release operation cap after achieving the desired running 

time (2 - 180 s).

4. Confirm adjusted time by pressing the operation cap twice 

(doubleclick) within 2 s. 

Increasing running time tenfold (max. 1800 s)

• Press the pushbutton cap again twice (double click) 

within 2 s following the short water pulse (1 s).

The tenfold running time is confirmed by two short water 
pulses (1 s).
The running time will be confirm by a short water pulse (1 s). 
If the running time cannot be set, the running time setting is 
deactivated. In order to activate the setting time, cartridge 
maintenance must be performed, but 

without

 replacing the 

battery, see description in the 

Maintenance

 section.

This product corresponds to the request of the 
appropriate EU guidelines.

Warning

Do not stay in the wet area! 
Use suitable aid.

Содержание Eurodisc SE 36 247

Страница 1: ...O 19 LV 23 RUS 27 E 4 DK 8 UAE 12 P 16 HR 20 LT 24 Design Quality Engineering GROHE Germany Eurodisc SE Eurodisc SE 94 005 331 ÄM 218740 10 12 36 247 D 1 I 13 N 25 GR 37 TR 49 BG 61 RUS 73 GB 4 NL 16 FIN 28 CZ 40 SK 52 EST 64 RUS 26 F 7 S 19 PL 31 H 43 SLO 55 LV 67 E 10 DK 22 UAE 34 P 46 HR 58 LT 70 ...

Страница 2: ...ease pass these instructions on to the end user of the fitting S v p remettre cette instruction à l utilisateur de la robinetterie Bitte diese Anleitung an den Benutzer der Armatur weitergeben 36 014 36 247 ...

Страница 3: ...II 4 J1 H1 H K K1 J A C C1 C2 D 2 B A 1 3 G E C G C G1 5 1 2 3 2mm 30 C N 7 10 U1 U V 2 5mm W2 Z 11 W1 W Z1 1 2 2 5mm N O P R S T T1 9 T N1 2 5mm N O P R 8 N1 6 L O P X1 S1 Y 2 5mm 12 S 22mm X N N1 ...

Страница 4: ... Dispose of batteries in accordance with national regulations Installation Plaster and tile the wall excluding the area occupied by the installation protection 1 Unscrew screws A and keep for mounting retaining cover see fold out page II Fig 1 2 Cut off rough installation protection B tile justified 3 Fasten retaining cover C with screws A C1 and washer C2 through the rough installation protection...

Страница 5: ...crew N1 and pull off handle cap N 3 Remove screw O and pull off scale handle P Caution Adjusting nut S should not be adjusted 4 Pull off red end stop T and refit with the arrow T1 pointing to the maximum desired temperature 5 Push on scale handle P in such a way that the 20 C mark on the handle coincides with the mark R on the cover plate and fasten with screw O 6 Push on handle cap N and fasten w...

Страница 6: ...see Adjustment IV Non return valve see spare parts on fold out page I Screw out complete non return valve 43 433 and take out non return valve 43 432 Replacement parts see fold out page I special accessories Care For directions on the care of this mixer please refer to the accompanying Care Instructions Problem Cause Remedy Problem Cause Remedy Water does not flow Battery without contact Water sup...

Страница 7: ......

Отзывы: