Grohe 33 122 Скачать руководство пользователя страница 4

2

GB

Application

Can be used in conjunction with: Pressurised storage 
heaters, thermally and hydraulically controlled 
instantaneous heaters. Operation with low-pressure 
displacement water heaters is 

not

 possible.

Specifications

  Flow pressure min. 0.5 bar / recommended 1 - 5 bar

Operating pressure

max. 10 bar

Test pressure

16 bar

If static pressure is greater than 5 bar, fit pressure 
reducer.
Avoid major pressure differences between hot and 
cold water supply.

Flow rate at 3 bar flow pressure:         approx. 8 l/min

Temperature
Hot water inlet

           

max. 80 °C

Recommended 

(energy saving) 60 °C

Water connection

hot - left

 

cold - right

Installation

Flush piping system prior and after installation of 
fitting thoroughly 

(Consider EN 806)

!

Installation and connection

, see fold-out page III, 

Fig. [1].
When assembling, the waste rod (A) has to be placed 
into the body.

Fit pop-up waste set (28 915)

, see fold-out page II. 

Seal plug-hole rim!

Open cold and hot-water supply and check con-
nections for leakage!

Check fitting for correct operation,

 see fold-out 

page III, Fig. [2].

Temperature limiter

On delivery, the temperature limiter (fitted as standard) 
is inoperative.
For commissioning see “Replacing the cartridge” 
point 1 to 4. 
Remove temperature limiter (B) and, depending on the 
maximum temperature required, turn clockwise (to 
increase temperature) or anticlockwise (to reduce 
temperature) and refit, see Fig. [3] and [4].

Flow rate limiter

This fitting is fitted with a flow rate limiter, permitting an 
infinitely individual variable reduction in the flow rate. 
The highest possible flow rate is set by the factory 
before despatch. 

The use of flow rate limiters in combination with 
hydraulic instantaneous water heaters is not 
recommended.

For commissioning see “Replacing the cartridge” point 
1 to 5, Figs. [3] and [5].

Maintenance

Inspect and clean all parts, replace as necessary and 
grease with special grease.

Shut off the hot and cold water supply!

I. Replacing the cartridge

, see Fig. [3].

1. Lever out plug (C).
2. Remove set screw (D) using a 3mm socket spanner 

and pull off lever (E).

3. Release screw (F) and pull off collar (G).
4. Unscrew cap (H).
5. Pull off  temperature limiter (B).
6. Remove screws (I) and detach complete 

cartridge (J).

7. Change complete cartridge (J).

Assemble in reverse order.

Caution

In this process, note the relative positions of the 
collar (G) and lever (E). The lugs (K) on the collar (G) 
must engage the central recesses (L) in the lever (E), 
see Fig. [6].

Make sure that the cartridge seals engage in the 
grooves on the housing. Fit screws (I) and tighten 

evenly and alternately

.

II.

Unscrew and clean 

flow straightener (13 960)

, see 

fold-out page II.

Assemble in reverse order.

Replacement parts,

 see fold-out page II  ( * = special 

accessories).

Care

For directions on the care of this fitting, refer to the 
accompanying Care Instructions.

Отзывы: