background image

DH/1-40 SPARK IGNITER AND SENSOR HARNESS 

 

 

1) Disconnect gas and electric power supply to the unit. 

2) List of Parts in the Kit 

 

Bill of Material for Part Number 153014 - Field Kit 

 

 

Part Number

 (Alt V)

 

Part  Description 

Quantity  Unit of Measure 

005654 

WASHER LOCK #10 

2  EA 

012845 

BAR FLAT 1/32" X 1/2 

10  IN 

014812 

WASHER PLAIN #10 

2  EA 

160466 

HEAT SHRINK TUBING, 200 DEG C 

0.167  FT 

003874 

SLEEVING SIZE 7/16 

8  FT 

160953 

WIRE, DIRECT SPARK, DH (CE) 
KETTLES 

1  EA 

160999 

CABLE TIE, HIGH TEMPERATURE 

10  EA 

160952 

WIRE, IGNITION SENSOR, DH(CE) 
KETTLES 

1  EA 

132289 Rev C 

FRONT BURNER SHROUD - DH/1-40 & 
DH-60 

1  EA 

153013 

INSTRUCTION SHEET FOR FIELD 
CONVERSION 

1  EA 

 

3) Preparation 

a)  Tilt kettle so the burners and ignition controls are accessible from the rear. 

b)  Remove burner covers located below the burner assembly.  

1.  Burner shroud bottom cover  

2.  Burner shroud front and sides  

c)  Remove lower access panel on kettle supporting column 

d)  Remove cover on ignition module control 

e)  Disconnect existing wiring harness from spark electrode and sensor electrode. 

f)  Disconnect the spark connector and sensor connector at ignition module. 

g)  Remove sensor and spark wires along with the silicone sealant from the plastic connector 

between the supporting column and ignition module box. 

h)  Thread out both wires and discard. 

i)  Disconnect fasteners at both ends to remove ground wire for the electronic ignition system. 
 

 
 
 
 

Отзывы: