DH/1-40 SPARK IGNITER AND SENSOR HARNESS
2
1) Disconnect gas and electric power supply to the unit.
2) List of Parts in the Kit
Bill of Material for Part Number 153014 - Field Kit
Part Number
(Alt V)
Part Description
Quantity Unit of Measure
005654
WASHER LOCK #10
2 EA
012845
BAR FLAT 1/32" X 1/2
10 IN
014812
WASHER PLAIN #10
2 EA
160466
HEAT SHRINK TUBING, 200 DEG C
0.167 FT
003874
SLEEVING SIZE 7/16
8 FT
160953
WIRE, DIRECT SPARK, DH (CE)
KETTLES
1 EA
160999
CABLE TIE, HIGH TEMPERATURE
10 EA
160952
WIRE, IGNITION SENSOR, DH(CE)
KETTLES
1 EA
132289 Rev C
FRONT BURNER SHROUD - DH/1-40 &
DH-60
1 EA
153013
INSTRUCTION SHEET FOR FIELD
CONVERSION
1 EA
3) Preparation
a) Tilt kettle so the burners and ignition controls are accessible from the rear.
b) Remove burner covers located below the burner assembly.
1. Burner shroud bottom cover
2. Burner shroud front and sides
c) Remove lower access panel on kettle supporting column
d) Remove cover on ignition module control
e) Disconnect existing wiring harness from spark electrode and sensor electrode.
f) Disconnect the spark connector and sensor connector at ignition module.
g) Remove sensor and spark wires along with the silicone sealant from the plastic connector
between the supporting column and ignition module box.
h) Thread out both wires and discard.
i) Disconnect fasteners at both ends to remove ground wire for the electronic ignition system.