![Grob Astir CS G102 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/grob/astir-cs-g102/astir-cs-g102_flight-manual_2268240031.webp)
MAINTENANCE MANUAL ASTIR CS
Rev. 9 28. Nov. 2005
6
It is absolutely essential to ensure that if the glider is
re-painted
all surfaces which
are directly exposed to the sun should be painted
WHITE.
When any repairs are done or a fresh coat of paint added
the position of the
empty weight C. of G. must be re-checked.
Maintenance on Hotellier quick-locks
must be conducted during each annual
inspection or 500 hours which ever occurs first. They are installed at the control-
connections of aileron and airbrakes at the wing-fuselage joint and at the elevator
connection to the pushrod.
The diameter of the swivel has to be measured at different points by a
micrometer with no differences in excess of 0,1 mm (0,004 in.) that means the
swivel must still be spherical. If there are large differences the swivels and
appropriate joints must be replaced.
Swivels and joints should be greased prior to each rigging.
The use of additional safety-pins guided through the holes of the wedge-type slides
increases safety, (Safety-pins No. 500 307.71 from A. Wurth, Industrieservice, D –
90431 Nuernberg, Germany or from GROB- Werke)
Содержание Astir CS G102
Страница 4: ......
Страница 8: ...FLIGHT MANUAL ASTIR CS Rev 9 28 Nov 2005 8...
Страница 19: ...FLIGHT MANUAL ASTIR CS Rev 9 28 Nov 2005 19 ASTIR CS Serial No 1438 1536...
Страница 29: ......