Mechanical maintenance work
Remove or install protection safety devices before starting or after completing any mainte-
nance work; this include:
covers,
safety instructions and warning signs,
grounding cables.
If you remove protective or safety devices, re-fit them immediately after the completing the
work.
Check if they are working properly!
1.14
Unattended Operation
CNC machines are designed for unattended operation. However, it may not be safe to let your
machining process run unmonitored. As it is the shop owner’s responsibility to set up the
machine safely and use best practice machining techniques, it is also their responsibility to
manage the progress of these methods. The machining process must be monitored to prevent
damage in case of a hazardous situation.
For example, if there is a risk of fire due to the machined material, an appropriate fire suppres-
sion system must be installed to reduce the risk of harm to personnel, equipment and the build-
ing. Have a specialist supplier install monitoring tools, before allowing machines to run
unattended.
It is especially important to select monitoring equipment that can immediately perform an appro-
priate action without human intervention to prevent an accident, should a problem be detected.
1.15
Accident report
Inform your supervisors and Grizzly Industrial, Inc. immediately in the event of
accidents, possible sources of danger and any actions which almost led to an accident (near
misses).
There are many possible causes for "near misses".
The sooner they are notified, the quicker the causes can be eliminated.
INFORMATION
We provide information about the specific dangers when working with and on the CNC machine
in the descriptions for these types of work.
1.16
Electronics
Have the machine and/or the electric equipment checked regularly. Immediately eliminate all
defects such as loose connections, defective wires, etc.
A second person must be present during work on live components to disconnect the power in
the event of an emergency. Disconnect the CNC machine immediately if there is a malfunction
in the power supply!
Comply with the required inspection intervals in accordance with the factory safety directive,
operating equipment inspection.
The operating company responsible for the machine must ensure that the electrical systems
and operating equipment are inspected with regards to their proper condition, namely,
by a qualified electrician or under the supervision and direction of a qualified electrician,
prior to initial commissioning and after modifications or repairs, prior to recommissioning
and at set intervals.
The intervals must be set so that foreseeable defects can be detected in a timely manner, when
they occur.
The relevant electro-technical rules must be followed during the inspection.
Содержание G0875
Страница 1: ...MODEL G0875 7 X 24 ENCLOSED CNC MILL OWNER S MANUAL For models manufactured since 3 19 ...
Страница 28: ... 26 Model G0875 Mfd Since 3 19 ...
Страница 31: ...Model G0875 Mfd Since 3 19 29 ...
Страница 32: ... 30 Model G0875 Mfd Since 3 19 ...
Страница 55: ...Model G0875 Mfd Since 3 19 53 ...
Страница 142: ... 140 Model G0875 Mfd Since 3 19 ...
Страница 264: ......