Determining Main Line Duct Size
The general rule of thumb for a main line duct is
that the
velocity
of the airflow must not fall below
3500 FPM.
For small/medium sized shops, using the inlet
size of the dust collector as the main line duct size
will usually keep the air velocity above 3500 FPM
and, depending on your system, will allow you to
keep multiple branches open at one time.
For the Model G0508 this is 9". Mark your drawing
as in
Figure 26
.
Figure 26.
Main line size labeled on sketch.
���
���
���
���
���
���
��
��
��
Determining Branch Line Duct Size
The general rule of thumb for a branch line duct is
that the velocity of the airflow must not fall below
4000 FPM.
For small/medium sized shops, using the dust
port size from the machine as the branch line duct
size will achieve the correct velocity in most appli-
cations. However, if the dust port on the machine
is smaller than 4", make the branch line 4" and
neck the line down right before the dust port.
Note:
Systems with powerful dust collectors work
better if multiple blast gates are left open. This
also allows you to run two machines at once.
Experiment with different combinations of blast
gates open/closed to find the best results for your
system.
Write your determined branch line sizes on your
drawing, as shown in
Figure 27
.
Figure 27.
Branch line sizes labeled on sketch.
���
���
���
���
���
���
��
��
��
��
��
��
��
��
��
��
A few frequently asked questions when deter-
mining branch line sizes:
What size of branch line do I use if the machine
has two dust ports?
Simply add the total CFM given for each size from
Figure 23
and refer to that CFM number in
Figure
28
. Then, split the branch line just before the dust
ports with matching duct sizes.
How do I manage two machines on the same
branch line?
You have two options:
1.
If both machines will be running at the same
time, add the total CFM given for each size
from
Figure 23
and match the branch line
given in
Figure 28
.
2.
If both the machines will never be run at the
same time, reference the machine with big-
gest dust port in
Figure 28
and add blast
gates after the Y-branch to open/close the
line to each machine.
Total CFM
Branch Line Size
600
5"
700
5"
800
6"
1000
6"
1200
7"
1400
8"
1600
8"
Figure 28.
Branch line sizing chart by total CFM
(for use when multiple machines share line).
Содержание G0508
Страница 3: ......
Страница 9: ...6 G0508 10 HP Industrial Dust Collector...
Страница 10: ...G0508 10 HP Industrial Dust Collector 7 Safety Instructions for Machinery...
Страница 36: ...G0508 10 HP Industrial Dust Collector 33 Wiring Diagram...
Страница 37: ...34 G0508 10 HP Industrial Dust Collector Parts Breakdown...
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......