background image

GREER COMPANY 

Crane Systems 

 

 

 

BA 1510

ANGLE INDICATOR 

 
 
 
 

 

 

OPERATOR'

MANUA

 

 

HYDRAULIC & LATTICE CRANE

 
 

 

 

Содержание Crane Systems BA 1510

Страница 1: ...GREER COMPANY Crane Systems BA 1510 ANGLE INDICATOR OPERATOR S MANUAL HYDRAULIC LATTICE CRANES...

Страница 2: ...ienced crane operator in safe crane setup and operation involving boom angles This manual provides the operator with instructions for using the BA 1510 System At no time may this System be used as a s...

Страница 3: ...ANUAL HYDRAULIC LATTICE CRANES BA 1510 ANGLE INDICATOR 5 SETTING AN ANGLE LIMIT LIMIT 5 REMOVING AN ANGLE LIMIT 5 THE ALARMS 6 PRE ALARMS 6 ALARMS 6 MOTION CUTS 7 SPECIAL FUNCTIONS 8 FACTORY RECOMMEND...

Страница 4: ...maximum limit Range 9 9 to 99 9 press to set cancel limits yellow and red warning lamps angle of crane boom press to lighten darken display The BA 1510 Angle Indicator meter BA 1510 Operator s Manual...

Страница 5: ...nd boom down movements are available as an additional option if desired Refer to MOTION CUTS page 7 SETTING AN ANGLE LIMIT Position the crane boom at the desired limit Refer to the illustration on the...

Страница 6: ...nds both the red and yellow lamps light up and a warning message appears Motion cuts if installed will activate OPTIONS WHEN AN ALARM ACTIVATES MOVE OUT OF THE ALARM CONDITION PRESS CANCEL ALARM TO SI...

Страница 7: ...ST UP BOOM DOWN AND TELESCOPE OUT BOOM ACTION DURING A TWO BLOCK CONDITION ACTIVATION OF THE MIN ANGLE ALARM HALTS BOOM DOWN UNLESS THE ALARM WAS PURCHASED AS AUDIOVISUAL ALARMS ONLY ACTIVATION OF THE...

Страница 8: ...ABLED WHEN THE RIGGING MODE IS ACTIVE PRESS CANCEL ALARM TO EXIT THE RIGGING MODE NOTE THIS ACTION WILL RESTORE ALARMS AND MOTION CUT FEATURES IF INSTALLED CALIBRATION MODE TO ACCESS THE CALIBRATION M...

Страница 9: ...LLED 2 IF USING AN ANTI TWO BLOCK SYSTEM TEST THE SYSTEM BY CAUTIOUSLY HOISTING THE HOOK S TO ACTUATE THE SWITCH AND ALARM 3 CHECK THE METER FOR ANY VISIBLE MOISTURE AND KEEP IT AS DRY AS POSSIBLE MON...

Страница 10: ...ALLY OR EVERY 1000 HOURS OF OPERATION 1 UNDO THE CABLE CONNECTORS IN THE SYSTEM INSPECT AND CLEAN THESE CONNECTORS GENEROUSLY REPACK EACH CONNECTOR WITH DOW CORNING 111 SILICON GREASE OR A COMPARABLE...

Страница 11: ......

Страница 12: ...12...

Отзывы: