![GreenWorks Pro 2607402 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/greenworks-pro/2607402/2607402_operators-manual_2264095008.webp)
7.2
INSTALL THE MIDDLE HANDLE
1. Align the holes in the middle handle (15) and the lower
handle (13).
2. Put the bolts (17) through the middle handle (15) and the
lower handle (13).
3. Tighten the handle knob (16) onto the bolt (17).
4. Repeat for left/right side.
7.3
INSTALL THE UPPER HANDLE
1. Align the holes in the middle handle (15) and the upper
handle (14).
2. Put the bolts (17) through the holes.
3. Tighten the handle knobs (16) onto the bolts (17).
4. Do the same operation on the other side.
7.4
INSTALL THE CHUTE-ROTATION
BOX
18
23
24
19
1. Align the holes in the panel of the chute-rotation box (23)
and the switch box (24).
2. Put the chute-rotation box screws (18) through the holes.
3. Tighten the chute-rotation box screw nuts (19) with a
wrench (not included).
7.5
INSTALL THE CHUTE
DEFLECTOR
1. Align the grooves (26) of the discharge chute with the
slot (25) on the chute housing.
2. Push the discharge chute (7) into position.
3. Tighten the discharge chute screws (18) with a Phillips
head screw driver to lock the discharge chute.
7.6
INSTALL THE BATTERY PACK
WARNING
•
If the battery pack or charger is damaged, replace the
battery pack or the charger.
•
Stop the machine and wait until the engine stops before
you install or remove the battery pack.
•
Read, know, and follow the instructions in the battery
and charger manual.
1. Open the battery door (5).
2. Align the ribs on the battery pack (20) with the grooves in
the battery compartment.
3. Push the battery pack (20) into the battery compartment
until the battery pack (20) locks into place.
8
English
EN
Содержание 2607402
Страница 1: ...2607402 SNB403 B v e R 2 0 1 7 7 2 0 8 0 P ...
Страница 2: ......
Страница 44: ......