background image

GreenTec 

                                                                            

 

Rotary Crusher GT 135 + 155 

 
 

 

Rotary Crusher 

GT 135 + 155 

 

HANDBOOK 

 

 

 

 

 

  

 
 
 

 

Содержание GT 135

Страница 1: ...GreenTec Rotary Crusher GT 135 155 1 Rotary Crusher GT 135 155 HANDBOOK...

Страница 2: ...this book different to the machine it relates to please contact the After Sales Department for advice Greentec Machinery Limited 2015 Please ensure that this manual is handed to the operator before u...

Страница 3: ...tor Preparation 8 Vehicle Ballast 8 Front weights 8 Rear weights 8 Factors that affect stability 9 Suggestions to increase stability 9 Safety 10 Safety Recommendations 11 Always 11 Never 12 Introducti...

Страница 4: ...r website www greentec eu where the login via the dealer s access gives you the latest updates on instructional and part books on our entire product range The password for dealer log in PUBLISHER We h...

Страница 5: ...er fully understands the manual s contents If the machine is resold the manual must be transferred to the new owner Please fill out the list below to ensure that the necessary information is at hand w...

Страница 6: ...dous situation which could result in damage to the machine and or equipment if not observed carefully NOTICE Specific or general information considered important or useful to emphasize LEFT HAND LH RI...

Страница 7: ...d our execution thereof the item of machinery described below complies with the basic health and safety regulations of the respective EU Directives Product GreenTec GT 135 GT155 Product code 99952135...

Страница 8: ...ttaching third party equipment to a vehicle that the maximum possible stability of the machine and vehicle combination is achieved this can be accomplished by the utilisation of ballast in order to co...

Страница 9: ...is preferable to use external weights but liquid can be added to around 75 of the tyre volume water with anti freeze or the heavier Calcium Chloride alternative can be used Addition of weights care sh...

Страница 10: ...as the engine is running Warning Stay clear of mower sawblades when running Never remove the safety protection Warning Stay out of gears swing area Warning Shut off engine and remove key before perfor...

Страница 11: ...When fully extended the machine may well exceed this height so extreme caution should be practiced For more information contact the Health and Safety Executive or your local power company Ensure that...

Страница 12: ...allow children to play on or around the machine at any time Never attempt any maintenance or adjustment without first disengaging the PTO lowering the head to the ground stopping the vehicle engine a...

Страница 13: ...fitting the PTO for the first time it may be necessary to adjust the length There should be maximum engagement of the sliding tubes without bottoming at the shortest operation position To check first...

Страница 14: ...side of the head Important If the machine has been laid up for any length of time there is a risk of risk of moving parts is stuck They must be lubricated and loosened before using the machine Start t...

Страница 15: ...sible forward speed bearing in mind the density of growth the terrain and the available horsepower taking extra care when turning particularly on slopes When turning it is not necessary to lift the ma...

Страница 16: ...completed Important Never carry out any servicing or maintenance work without first disengaging the PTO and stopping the tractor engine It is imperative that the following checks are carried out in or...

Страница 17: ...8 Blade bolts 810 Easy Lock on rotor 42 Delivery Start up Retighten motor bolts blade bolts and the Easy lock after 2 hours work Daily Every 8 hours Check condition of blades and blade bushes and ens...

Страница 18: ...nging and swivel on hardened steel bushes which are easily replaced When replacing blades it is important that blades are replaced in sets in order to retain balance of the rotor Bushes must be replac...

Страница 19: ...m cleaners and be sure to remove all detergents to avoid any discolouring or damage to paint Grease all grease points until fresh grease shows Store PTO shaft in a dry place Remember the GreenTec mach...

Страница 20: ...s linkage pins top links ball ends unless there is a manufacturing or material defect or the cost of normal servicing items such as oils and lubricants 5 This warranty does not cover any expenses or l...

Отзывы: