
PRE-INSTALLATION
Greenstar Ri
ErP
- 6 720 813 283 (2015/07)
17
4.7
PLUMBING MANIFOLD
4.7.1
CONNECTIONS
Use the fittings supplied in the Hardware literature pack:
• Use the 22mm copper pipes (1 & 2) provided with the appliance, as
shown in the diagram opposite.
• If the flow and return pipes are to be run behind the appliance it
maybe an advantage to connect the pipes before hanging on the wall
especially if space is limited.
Fig. 18 Plumbing manifold
Fig. 19 Pipe work dimensions
Heating System
22mm compression fittings
Gas
22mm compression fittings
Do not use the pre-formed copper pipes supplied with
the boiler for the gas supply.
These copper pipes are for water only.
Further guidance on pipe routing can be found printed
on the boiler template (supplied with the boiler).
1
2
4
3
3
4
6720644744-13.1W
o
Pipes in alternative position
Return
Flow
#
Function
From left
case edge
Diameter of
pipe
1
Gas
55mm
22mm
2
Condensate
210mm
22mm
3
Cylinder & CH Flow
285mm
22mm
4
Cylinder & CH Return
350mm
22mm
Table 15 Key to figures 18 & 19
6720644744-17.1W
o
reset
max
1
2
3
4
Содержание 12Ri ErP
Страница 52: ...Greenstar Ri ErP 6 720 813 283 2015 07 52 NOTES...
Страница 53: ...Greenstar Ri ErP 6 720 813 283 2015 07 53 NOTES...
Страница 54: ......
Страница 55: ......