Installation and maintenance
Instructions Greenlife Biovitor
Technical modification reserved
E-Mail:
6
No liability is assumed for printing errors
www.greenlife.de
Biovitor installation and setup
The installation is to be carried out according to the picture. The manufacturing
process and the choice of materials allow easy and simple handling of all biovitors. It
is important to ensure that the biovitor is held to the floor and stands securely. This is
largely done by the marble pebble included in the delivery. However, stability and
buoyancy can be increased by additional pebbles or further weights.
A branch should be placed as an emergency overflow at the highest point in the
cistern. Please refer to the illustration.
In case of particularly heavy leaf fall, it is recommended to install the GreenLife gutter
grids or to filter the leaves otherwise in the gutter or downpipe.
1. inlet
2. overflow
Diameter identical with inlet
3. overflow siphon (optional)
4. emergency overflow as branch 45°.
5. inlet pipe
6. biovitor