background image

ESG50GL Battery-powered, High-speed Cable Cutter

Greenlee / A Textron Company

4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070

10

Assembly

Motor, Gearbox, and Bearing

1.  Install two Fillister head screws (112) into the spacer 

 

(not numbered) and motor (90). Tighten the screws.

2.  Install four screws (not numbered) into the gear 

housing (94). Tighten the screws.

3.  Install four screws (93) into the mounting block (109) 

and gear housing (94). Tighten the screws.

4.  Replace the grooved ball bearing (101) and snap 

ring (100) subassembly.

5.  Replace the eccentric (103). Use a fiber mallet to 

 

tap the eccentric onto the shaft. Replace the ball 

bearing (91).

6.  Align the end cap (102). Use a fiber mallet to tap the 

cover until it is flush on the mounting block (109). 

Install two screws (92).

7.  Align the gear housing/motor subassembly so that 

the pump piston (152) extends through the mount-

ing block (109) and makes contact with the grooved 

bearing (101). Locate and start the screws (108) 

through the mounting block and into the pump 

housing. Tighten the screws.

Pump

1.  Insert the pump piston (152) into the pump housing.
2.  Insert the seal (122) and unloading valve assem-

bly into the pump housing. Grasp the needle valve 

subassembly by the pressure relief (126) and twist 

it several turns clockwise. Stop when the piece of 

tape is facing up.

3.  Assemble the pump piston (150), valve stem (156), 

washer (153), spring (155), and screw plug (151). 

 

Be sure to replace the sealing washer (154). Torque 

the screw plug (151) to 101 Nm (75 ft-lb).

4.  Install the release lever (107) so that the forked end 

engages the unloading valve subassembly between 

the pressure relief (126) and the support ring (127). 

Install the screw (99) and washer (104).

5.  Insert the threaded bushing (79) and feed tube sub-

assembly (77, 78, 82). Screw in until snug.

6.  Install the reservoir (74). Slip the O-ring (80) over 

 

the reservoir. Using a hooked tool, carefully slip the 

 

O-ring over the lip of the pump housing.

7.  Insert the plug (76) into the reservoir.

Main Components

  1.  Remove the protective plastic bag from the 

 electronics subassembly. Insert the LED into the 

LED bushing (8).

  2.  Lay the gear housing/motor subassembly into the 

left half of the housing. Insert the circuit board into 

the circuit board slot so that the wires and chip face 

in the direction of the trigger.

  3.  Lay the wires into the case. Be sure that the wires 

will not be pinched.

  4.  Guide the wires for the battery clip so that the 

battery wires lay on top of the electronics box; 

 

install the battery clip so the red wire is upward.

  5.  Install the trigger cover (56). Press and release the 

trigger to be sure that it operates freely.

  6.  Locate the right housing half (59) on top of the left 

housing half (60). Check for pinched wires.

  7.  Install the housing screws (51, 53).

Note:  The handle screw (51) must engage the  

nut (52).

  8.  Install the piston (18).
  9.  Install the spring (17).
10.  Replace the front head assembly. Twist the cutting 

head base (30) until it stops; back off 3/4 of a turn 

and tighten the screws (29). Be sure that the cutting 

head assembly rotates freely approximately 350°.

11.  Install the cutting blade (26). Insert the pin (19) 

through the ram.

12.  Clamp the head assembly into a vise with the res-

ervoir plug facing upward. Remove the fill plug (76) 

and fill the reservoir with hydraulic oil.

13.  Install the battery.
14.  Squeeze the trigger while pressing the release lever 

for 45 to 60 seconds. Fill the reservoir with hydraulic 

oil. Replace the fill plug (76).

15.  Replace the tank cover (58) and tank cover 

 

screws (53).

Содержание GATOR Plus ESG50GL

Страница 1: ...High speed Cable Cutter Read and understand all of the instructions and safety information in this manual before operating of servicing this tool Register this product at www greenlee com 99945177 201...

Страница 2: ...safe operation and maintenance procedures for the following Greenlee tool ESG50GL Battery powered High speed Cable Cutter Keep this manual available to all personnel Replacement manuals are available...

Страница 3: ...lectric shock hazard This tool is not insulated When using this unit near energized electrical lines use proper personal protective equipment Failure to observe this warning could result in severe inj...

Страница 4: ...anything to contact the battery terminals Do not immerse the batteries in liquid Liquid may create a short circuit and damage the battery If bat teries are immersed contact your service center for pro...

Страница 5: ...ing Flange 9 Oil Reservoir 10 Oil Plug Cable Cutter Length 400 mm 15 3 4 Width 76 mm 3 Height 362 mm 14 1 4 Mass Weight with battery 4 5 kg 10 lb Sound Level 75 dB A at 1 meter Vibration 2 5 m s2 Moto...

Страница 6: ...ilure to observe these warnings could result in severe injury or death Do not cut steel or ACSR Cut only copper and aluminum cable This tool is not designed for continuous use After 30 to 40 cutting c...

Страница 7: ...could ignite and cause serious injury or property damage 2 Fully retract the blades Place the tool in the carry ing case Store in a cool dry place 3 Charge the battery Monthly 1 Thoroughly clean all s...

Страница 8: ...reservoir Air in hydraulic system Pull trigger and hold retract button simultaneously Hold for approxi mately 10 seconds Battery load display flashes constantly Battery charge low Charge or replace ba...

Страница 9: ...ing Pump 1 Use a hooked tool to remove the reservoir O ring 80 Gently tug it over the reservoir 2 Remove the reservoir 74 3 Remove the pump piston 152 4 Remove the screw plug 151 washer 153 pump pisto...

Страница 10: ...127 Install the screw 99 and washer 104 5 Insert the threaded bushing 79 and feed tube sub assembly 77 78 82 Screw in until snug 6 Install the reservoir 74 Slip the O ring 80 over the reservoir Using...

Страница 11: ...ESG50GL Battery powered High speed Cable Cutter Greenlee A Textron Company 4455 Boeing Dr Rockford IL 61109 2988 USA 815 397 7070 11 Illustration 57 51 56 53 9 11 53 59 52 8 60 10 12 58 53...

Страница 12: ...ESG50GL Battery powered High speed Cable Cutter Greenlee A Textron Company 4455 Boeing Dr Rockford IL 61109 2988 USA 815 397 7070 12 Illustration 15 16 18 17 31 29 19 32 25 28 33 26 30 27 34...

Страница 13: ...y 4455 Boeing Dr Rockford IL 61109 2988 USA 815 397 7070 13 Illustration 72 73 83 79 81 70 80 71 76 74 82 75 77 78 92 91 101 93 109 99 112 97 98 95 111 90 110 100 102 103 96 108 107 104 94 155 156 150...

Страница 14: ...d base 1 31 50058371 Adapter disk 1 32 O ring 1 33 50041789 Latch 1 34 50034308 Retaining ring 4 50013459 Housing unit green includes items 51 60 51 50042203 Screw 1 52 50042211 Nut 1 53 50042076 Scre...

Страница 15: ...bearing 1 102 50041088 End cap 1 103 50041231 Eccentric 1 104 Lock washer 1 105 Spring 1 107 Release lever 1 108 50121839 Screw 2 109 50084022 Eccentric case 1 110 50013513 Gearbox 1 111 50013521 Gear...

Страница 16: ...with double asterisks 50118927 Release lever assembly includes items marked with a 50059556 Case with inserts 50029991 12 V battery NiCd 50030469 12 V charger 110 VAC 50030477 12 V charger 220 VAC 50...

Отзывы: