7
TAKE DOWN THE GREENHOUSE
Step 8
●
Take off all self tapping screws from the wall.
●
Press the push pin on each leg and retract the legs to their original height.
●
Press the push button on each slider to unlock the frame.
●
Take off the PE top, lift one corner of the frame until all legs are raised off the ground
except for the 1 leg on the opposite corner. Push inward until the frame is fully closed.
X3
loop
loop
Содержание Eagle Peak
Страница 1: ...Eagle Peak 9 ft x 4 ft Foldable Green House INSTRUCTION MANUAL Thank you for choosing Eagle Peak...
Страница 2: ......
Страница 11: ......
Страница 12: ......