background image

®

Upon receiving unit, check for any damage
and report it immediately to the shipper. Also
check to see that all accessory items are
accounted for. 

Move fan to desired location and fasten
securely through mounting holes in base.
Shims may be necessary depending upon
roofing material thickness. The diagram
below shows dimensions for Model CUBE.

Access to the motor compartment is
accomplished by removing the screws
designated “R” in Fig. 1. The cover can then
be removed and placed on a flat surface in
an area protected from strong winds.

The motor’s amperage and voltage rating
must be checked for compatibility to the
supply voltage prior to final electrical
connection. For NFPA - restaurant CUBE
applications, the electrical supply must enter
the motor compartment through the breather
tube. For other non-flammable applications
the electrical supply can be routed through
the conduit chase between the curb cap and
the bottom of the motor compartment.

Consult local code authorities for your

specific requirements.

A drain trough is provided on all CUBE fans
for single-point drainage of water and
residue. Some means for collection of this
residue must be provided, either a container
directly under the trough or use of an
adapter and pipe to carry the residue to a
remote collection point. An optional grease
trap with water separator baffles is available
from your Greenheck representative.

Installation, Operating and Maintenance Manual

READ AND SAVE THESE INSTRUCTIONS

Model CUBE Belt Drive

Upblast Centrifugal

Roof Exhaust Fan

PN 457693

MODEL

A

B

*C

D

Shaft

Bearings

Damper

Size

Roof

Opening

Approx.

Unit

Weight

CUBE-098, 101, 101HP, 121, 131

19

24

7

/

8

28

1

/

4

17

3

/

8

3

/

4

12x12

14

1

/

2

x 14

1

/

2

66

CUBE-141, 141HP

CUBE-161, 161HP, 161XP

22

28

7

/

8

29

3

/

4

19

3

/

8

3

/

4

16x16

18

1

/

2

x 18

1

/

2

87

CUBE-180

3

/

4

CUBE-180HP

1

126

CUBE-200

30

35

3

/

8

28

5

/

8

21

3

/

4

18x18

20

1

/

2

x 20

1

/

2

CUBE-200HP

1

142

CUBE-220, 220HP

CUBE-240, 240HP, 240XP

34

42

3

/

4

33

7

/

8

25

1

/

2

1

24x24

26

1

/

2

x 26

1

/

2

175

CUBE-300, 300HP, 300XP

40

50

36

29

1

30x30

32

1

/

2

x 32

1

/

2

313

CUBE-360, 360HP, 360XP

46

58

5

/

8

39

1

/

8

29

3

/

8

36x36

38

1

/

2

x 38

1

/

2

440

CUBE-420

52

65

3

/

16

44

3

/

4

35

1

/

4

1

1

/

4

42x42

44

1

/

2

x 44

1

/

2

578

CUBE-480

58

74

3

/

16

48

1

/

8

36

1

1

/

2

48x48

50

1

/

2

x 50

1

/

2

675

Dimension “A” is the inside dimension of the curb cap. The roof curb should be 1

1

/

2

in. less than

the curb cap to allow for roofing and flashing.

All dimensions are in inches. *May vary depending on motor size.

Dimensional Data

B

R

1

3

/

4 in.

A

D

*C

Fig. 1

Installations

Recommended
General
Ventilation
Installation

Recommended
Commerical
Kitchen
Installation

8 in. or 12 in. min.

Recommended

Roof Opening

3

/

4 in.

1

1

/

4 in.

1

1

/

4 in.

Recommended

Duct and

Damper Size

Wiring by

Others

Factory Wired
Motor to
Disconnect

Roof Deck

Damper

Welded Duct

by others

min. of 18 in.

above roof

deck (per

NFPA)

NEMA 3R
Disconnect
factory wired
from motor to
disconnect
through the
breather tube

Liquid Tight
Flexible Conduit
by Others

Recommended

Roof Opening

Roof Deck

Minimum 40 in.

Discharge

Height

8 in. min.

Grease
Trap

Vented Curb
Extension

Optional

(per NFPA)

Отзывы: