IMPORTANT

Adjust (tighten) belt tension after the first 24-48 hours 
of operation.

Maintenance: CUE / CUBE

Installation and maintenance are to be performed only 
by qualified personnel who are familiar with local codes 
and regulations and who are experienced with this type 
of equipment.

Motor maintenance is generally limited to cleaning 
and lubrication (where applicable). Cleaning should be 
limited to exterior surfaces only. Removing dust buildup 
on motor housing ensures proper motor cooling.

Greasing of motors is only intended when fittings are 
provided. Many fractional horsepower motors are 
permanently lubricated and should not be lubricated 
after installation. Motors supplied with grease fittings 
should be greased in accordance with manufacturers’ 
recommendations. Where motor temperatures do not 
exceed 104ºF 

(40ºC)

, the grease should be replaced 

after 2,000 hours of running time as a general rule.

Wheels require very little attention when moving clean 
air. Occasionally, oil and dust may accumulate causing 
imbalance. When this occurs the wheel and housing 
should be cleaned to ensure smooth and safe operation.

All fasteners should be checked for tightness each  
time maintenance checks are performed prior to 
restarting unit.

A proper maintenance program will help these units 
deliver years of dependable service.

WARNING

Always disconnect, lock and tag power source before 
servicing. Failure to disconnect  power source can 
result in fire, shock or serious injury.

CAUTION

Uneven cleaning of the wheel will produce an out of 
balance condition that will cause vibration in the fan.

WARNING

This unit should be made non-functional when 
cleaning the wheel or housing (fuses removed, 
disconnect locked off).

Inspection: CUE / CUBE

Inspection of the fan should be conducted at the 
first 30 minute and 24 hour intervals of satisfactory 
operation.

30 Minute Interval

Inspect bolts, setscrews and motor mounting bolts. 
Adjust and tighten as necessary.

24 Hour Interval

Check all internal components. On CUBE unit only, 
inspect belt alignment and tension. Adjust and tighten 
as necessary.

 8a.  Sizes 071-161:  Belts should be tensioned just 

enough to prevent slippage at full load. 
Note: Belts should have a slight bow on the slack 
side while running at full load (see figure 12a).

 8b.  Sizes 180-540: Belt tension should be adjusted to 

allow 1/64 in. 

(0.397 mm)

 of deflection per inch of 

belt span. For example, a 15 in. 

(381 mm)

 belt span 

should have 15/64 in. 

(0.234 mm)

 (or about 1⁄4 in. 

(6 mm)

) of deflection with moderate thumb pressure 

at mid-point between pulleys (see figure 12b).

  9.  The adjustable motor pulley is factory set for the 

RPM specified. Speed can be increased by closing 
or decreased by opening the adjustable motor 
pulley.

 10.  Any increase in speed represents a substantial 

increase in the horsepower required by the unit.

 11.  Motor amperage should always be checked to 

avoid serious damage to the motor when speed is 
varied.

Operation: CUE / CUBE

  1.  Before starting up or operating fan, check all 

fasteners for tightness. In particular, check the 
setscrews in wheel hub (and pulleys, if applicable).

  2.  While in the OFF position or before connecting the 

fan to power, turn the fan wheel by hand to be sure 
it is not striking the venturi or any obstacle.

  3.  Start the fan and shut it off immediately to check 

rotation of the wheel with directional arrow in the 
motor compartment, see figure 8.

  4.  When the fan is started, observe the operation and 

check for any unusual noises.

  5.  With the system in full operation and all ductwork 

attached, measure current input to the motor and 
compare with the nameplate rating to determine if 
the motor is operating under safe load conditions.

  6.  Keep inlets and approaches to fan clean and free 

from obstruction.

Slack
Side

Deflection

 

Fig. 12a

 

Fig. 12b

®

Содержание CUBE 098

Страница 1: ...aces or chemicals Replace cord immediately if damaged 6 Verify that the power source is compatible with the equipment 7 Never open access doors to a duct while the fan is running Model CUE Direct Driv...

Страница 2: ...in or snow Temperatures should be evenly maintained between 30 to 110 F 1 to 43 C wide temperature swings may cause condensation and sweating of metal parts All accessories must be stored indoors in a...

Страница 3: ...using Tectyl 511M Rust Preventive WD 40 or the equivalent Removing From Storage As fans are removed from storage to be installed in their nal location they should be protected and maintained in a simi...

Страница 4: ...ilation Installation Fig 5 Typical Roof Mounting Installation 8 or 12 in min 203 or 305 mm Recommended Roof Opening 1 11 4 in Recommended Duct and Damper Size Wiring by Others Factory Wired Motor to D...

Страница 5: ...EMA 3R Disconnect factory wired from motor to disconnect through the breather tube Liquid Tight Flexible Conduit by Others Roof Deck Recommended Emergency Smoke Control Installation Electric Connectio...

Страница 6: ...CUE 180 200 1 2 13 CUBE 098 3 32 2 CUBE 099 161 1 4 6 CUBE 180 300 1 2 13 CUBE 360 480 3 4 19 WARNING Correct direction of wheel rotation is critical Reversed rotation will result in poor air performa...

Страница 7: ...d be conducted at the rst 30 minute and 24 hour intervals of satisfactory operation 30 Minute Interval Inspect bolts setscrews and motor mounting bolts Adjust and tighten as necessary 24 Hour Interval...

Страница 8: ...NLGI Grade 2 consistency such as those listed here may be used Belt Bearing Maintenance CUBE Unit 1 Belts tend to stretch after a period of time They should be checked periodically for wear and tightn...

Страница 9: ...ork Check proper operation of face and bypass dampers Check filters and access doors Fan does not operate Electrical supply Check fuses circuit breakers Check for switches off Check for correct supply...

Страница 10: ...___________________ Date ___________________Time _____________ AM PM Notes ___________________________________________ _________________________________________________ _______________________________...

Страница 11: ...the entire unit to be explosion proof Motor Cover Belt Motor Pulley Motor Fan Shaft Curb Cap Venturi Shaft Pulley Drive Frame Assembly Shock Mounts Vertical Support Windband Wheel Note For replacement...

Страница 12: ...e Library under Warranties Greenheck s Centrifugal Upblast and Sidewall Exhaust catalog provides additional information describing the equipment fan performance available accessories and speci cation...

Отзывы: