Green motion PIPISTREL SKYCHARGE Скачать руководство пользователя страница 3

SKYCHARGE Mobile 

 TECHNICAL DOCUMENTATION 

 

Page 3 

 

 

1

 

INTRODUCTION 

1.1

 

Technical Specifications 

 

 

 

POWER INPUT 

DC SKYCHARGE MOBILE CHARGER 

Input voltage 

3 x 400 V

AC

 50 Hz 

Input current 

3 x 32 A

rms

 (22 kW) 

Electrical Grid Connection 

Plug CEE 32 A, 5 poles 400 V, 6h 

Power factor 

> 0.99 

Standby consumption 

< 50 W 

POWER OUTPUT 

Output power 

22 kW  

Output voltage 

500 V

DC

  

Output current 22 kW 

55 A

DC

 

Output type 

GB/T cable 

Efficiency 

> 96% 

Simultaneous charges 

USER INTERFACE & CONTROL 

User interface 

10-inch touch screen display, Led charge status indicator 

Mobile phone app 

iOS and Android (online charging station) 

Control of access 

RFID, App, SMS, Scan & Charge 

Network interface 

Ethernet cable; 3G/4G 

Remote management 

Software management system (eMobility Cockpit) (online) 

ENVIRONMENTAL 

 

Operating temperature 

-25°C to 45°C 

Altitude 

Up to 2000 m (6500 ft.)   

Setting 

On rollers. Indoor or outdoor. 

Humidity 

< 95% relative humidity 

MECHANICAL 

Dimensions 

984 x 947 x 453mm 

Weight 

 ~ 85 kg 

Housing material 

Stainless steel 

Cooling 

Fan cooling 

Cable length 

5 meters (16.5 ft.) 

REGULATION 

Conformity 

IEC 61851-1 

Protection rating 

IP54 

Communication protocol 

OCPP 1.6J, AS6968 

Bidirectional 

V2G ready 

Protection 

Over current, under voltage, over voltage, residual current, surge protection, short circuit, over 
temperature, ground fault, galvanically insulated. 
The RCD circuit breaker (40 A, 30 mA) needs to be dedicated to the charging station power line at 
the panel. 

1.2

 

Dimensions and weights 

Width 

984 mm 

Height 

947 mm 

Depth 

453 mm 

Weight 

~ 85 Kg 

       

 
 

Содержание PIPISTREL SKYCHARGE

Страница 1: ...SKYCHARGE MOBILE POWERED BY GREEN MOTION AND PIPISTREL TECHNICAL DOCUMENTATION NON CONTRACTUAL PICTURES...

Страница 2: ...4 USAGE OF THE STATION 10 4 1 Description of the trolley 10 4 2 Description of the station 10 4 3 Charging states 10 5 MAINTENANCE 14 5 1 Troubleshooting 14 5 2 Cleaning or replacing the filters 15 5...

Страница 3: ...interface Ethernet cable 3G 4G Remote management Software management system eMobility Cockpit online ENVIRONMENTAL Operating temperature 25 C to 45 C Altitude Up to 2000 m 6500 ft Setting On rollers...

Страница 4: ...evice Doepke RCCB DFS 4 040 4 0 03 A EV R Or Eaton 167897 FRCDM 40 4 03 G B 1 The Installer must define the types of Circuit breaker The circuit breakers at panel of 40 A overvalued in order to ensure...

Страница 5: ...NICAL DOCUMENTATION Page 5 Circuit diagram Connection Diagram Figure 1 GB T 18487 1 2015 Schematic Diagram of DC Charging Extracted from AS6968 Rev A Figure 2 GB T 20234 3 2015 DC Charging Plug Extrac...

Страница 6: ...main converter box can lead to electric shock hazards Please make sure to carefully read instructions In case of a doubt please immediately contact Green Motion support 3 1 Opening the SKYCHARGE Mobil...

Страница 7: ...working under voltage shall be avoided The electrical cable must reach the terminal from the left The electrical cable and the communication cable can be introduced into the SKYCHARGE Mobile housing f...

Страница 8: ...in Password admin01 The router requires a password change during the first start Please contact Green Motion SA support for the password 3G 4G Configuration Insert the SIM card in the SIM1 port Connec...

Страница 9: ...appears it must be closed Go to the Network WAN menu Activate the WAN network and deactivate the other networks Press Save Apply o Authorize the management of the router from the WAN Only if in a priv...

Страница 10: ...1 Button indicator 2 Touch screen display 3 RFID reader 4 LED display 5 Emergency stop button To start a charge simply connect the plane via the GB T cable Then press on the screen to charge the plan...

Страница 11: ...ging states Button indicator Button Status display Comments No light Not powered or start up stage Green light on Ready to be use or need user interaction Blue light on Charge initialization vehicle c...

Страница 12: ...atus display Comments Green light on Ready to be use Flashing green light Start up stage Breathing green light Waiting for user interaction Flashing blue light Charge start up stage Breathing blue lig...

Страница 13: ...e In this section you will find the information to start your experience LED Display status display Splash screen Touch the screen to wake up Authentication screen Before any operation please ensure t...

Страница 14: ...ging station visual indicators are red Try to disconnect the plane from the charging station and retry Check the emergency button it should be pull out Antenna bar graph is red Check that the connecti...

Страница 15: ...y In case of obstruction filters need to be replaced immediately Filters can be replaced They are accessible as described below Using a 2 5 mm hex key remove the 2 screws attaching each filter cartrid...

Отзывы: