GREEN BANK WG48100 Скачать руководство пользователя страница 21

- 20 - 

 

6.Product Warranty 

6.1.

 If you have purchased this product from our factory, you should be aware that this warranty is 

provided in addition to other rights and remedies held by a consumer at law.   

6.2.

 You are entitled to a replacement or refund for a major failure and for compensation for any 

other reasonably foreseeable loss or damage. You are also entitled to have the goods repaired 

or replaced if the goods fail to be of acceptable quality and the failure does not amount to a 

major failure.  

6.3.

 For the above mentioned products, you receive our factory warranty valid for 20 years from the 

date of delivery from factory. Factory warranty covers any costs for repair or spare parts during 

the agreed period beginning on the date of delivery of the device, subject to the following 

conditions.  

6.4.

 Factory Warranty Scope  

The factory warranty does not cover damages caused by following reasons:  

--Breaking the product seal (opening the casing)  

--Transport damage 

--Incorrect installation or commissioning  

--Failure to observe the user manual, quick installation instructions 

--Incorrect usage or inappropriate operation 

--Insufficient ventilation of the device 

--Failure to observe the applicable safety regulations 

--Force majeure  

Neither does it cover cosmetic defects which do not influence the energy production.  

 

6.5.

 Warranty conditions  

If the battery becomes defective during the agreed factory warranty period and, unless this 

should be impossible or disproportionate, one of the following options will be selected at the 

discretion of factory: 

--Battery repair or  

--Battery repair at on-site, or  

--Exchange for a replacement device of equivalent value with regard to model and 

age.  

In the latter case, the remainder of the warranty entitlement will be transferred to the 

replacement device and your entitlement will be documented at factory.  

 

Excessiveness in the meaning above exists in particular if the cost the measures for factor will be 

unreasonable.  

--In view of the value that the device would have without the defect 

--Taking in account of the significance of the defect, and  

--After consideration of alternative work around possibilities at factory customers could revert to 

without significant inconvenience.  

 

Please fill the required information in and send this page to factory when you need to apply warranty 

Содержание WG48100

Страница 1: ...POWER BANKS STORAGE SYSTEM User Manual Version 1 0 WG48100 51 2V 100AH 5 12Kwh WG48250 51 2V 200AH 10 24Kwh WG48320 48V 320AH 13 44Kwh For On Off Hybrid Solar Storage System...

Страница 2: ...ecifications 8 4 Safe handling guide 11 4 1 System Diagram 11 4 2 Tools 11 4 3 Safety Gear 11 5 Installation 12 5 1 Inventory of items 12 5 2 Installation Location 13 5 2 1 Minimum clearances Error Bo...

Страница 3: ...ng list first if the battery is damaged or spare parts are missing please contact the dealer Before installation be sure to cut off the grid power and make sure the battery is in the turned off mode W...

Страница 4: ...Life cycles 80 DOD 25 C 8500 Cycles Storage time temperature 5 months 25 C 3 months 35 C 1 month 45 C Operation temperature 20 C to 60 C 60 25 Relative Humidity Storage temperature 0 C to 45 C 60 25 R...

Страница 5: ...stent performance over wide temperature range Wall mounted convenient installation Integrated state of the art BMS to manage and monitor battery information including voltage current and temperature a...

Страница 6: ...address 4 CAN port CAN CAN port 5 RS485 port RS485 RS485 port 6 Port Reset button RST For reset the batter 7 Battery holder 8 Switch OFF ON Normal close 9 Handle 10 LED ALM Alarm indicator 11 LED RUN...

Страница 7: ...6 Chart 2 Battery Capacity Chart 3 Battery status...

Страница 8: ...omputer Address Reserved Address portal for multiple parallel connections 3 5 Wake Up button Battery On When battery is shut down press this RST button for 6 seconds It is activated when the LED light...

Страница 9: ...nal Specifications Interface introduction Main menu page Electricity dormancy activated will show the welcome screen press the MENU button to enter the main menu page As shown in the figure below Batt...

Страница 10: ...9 Battery temperature Battery Warning Battery Capacity...

Страница 11: ...not shown press ENTER key can enter the corresponding page 3 Press ESC key can be returned at the next higher level directory In any position press NEMU key can return to the main menu page 4 In a do...

Страница 12: ...se properly insulated tools to prevent accidental electric shock or short circuits If insulated tools are not available cover the entire exposed metal surfaces of the available tools except their tips...

Страница 13: ...contact us immediately NO Item Quantity Specification 1 Battery Pack 1 PC 5 12KWH 10 24KWH 13 44KWH 2 Wall mounted Bracket and Screws 1 SET One Bracket and 12pcs screws 3 Power Cable 1 SET 35mm2 4AWG...

Страница 14: ...temperature is within the range from 0 C to 45 C The temperature and humidity is maintained at a constant level There is minimal dust and dirt in the area Installation must be vertical or tilted backw...

Страница 15: ...sition 3 Drill 8 holes according to the hole position it is 10 with depth 60mm 4 Hammer the M8 screws to the above holes and screw the nut Note Do not position screws flush to the wall leave 10 to 20...

Страница 16: ...types When the battery needs to be used in parallel the maximum connection is 16 units but we recommend 2 4 units according to application When connecting with off grid 48VDC solar inverters it does n...

Страница 17: ...16 Three pcs connect diagram Four pcs connect diagram NOTE IF YOU NEED MORE PARALLEL DETAILS PLEASE CONSULT WITH ENERGTECH SOLAR SALES ASAP...

Страница 18: ...s Canbus with hybrid solar inverter but we recommend to use 2 4 units according to application The application needs power and communication connections as below choose suitable parallel power cables...

Страница 19: ...18 One pcs connect diagram Two pcs connect diagram...

Страница 20: ...19 Three pcs connect diagram Four pcs connect diagram NOTE IF YOU NEED MORE PARALLEL DETAILS PLEASE CONSULT WITH RELATED SALES MANAGER ASAP...

Страница 21: ...lation instructions Incorrect usage or inappropriate operation Insufficient ventilation of the device Failure to observe the applicable safety regulations Force majeure Neither does it cover cosmetic...

Страница 22: ...arranty Card User Information Company User Name Address Telephone Email Project installation location Product Information Battery Model Serial No Invoice Number Purchase Date Dealer Commission date Fa...

Отзывы: