background image

8

 

 

Air-to-water Heat Pump

 

 

 

Note:  the  swimming  pool,  solar  kit  and  water  mixing  accessory  are  optional  parts.  When  they  are  required, 

please contact the manufacturer.

 

2. Operating Principle of the Unit

 

DC Inverter Air  to  Water  Heat  Pump  is  composed  of  outdoor  unit,  indoor  unit  and internal-fan  coil  water  tank.

 

Operation functions:

 

Cooling;

 

(1)  Heating; 
(2)  Water heating; 
(3)  Cwater heating; 
(4)   water heating; 
(5)  Emergency mode; 
(6)  Quick water heating; 
(7)  Holiday mode; 
(8)  Forced Operation Mode; 
(9)  Silent mode; 
(10)  Disinfection mode; 
(11)  Weather-dependent Operation; 
(12)  Floor debugging 
(13)  Air removal of the water system 
(14)  Other thermal 

Cooling: 

in cooling mode, the refrigerant is condensed in the outdoor unit and evaporated in the indoor unit. Via 

the heat exchange with water in the indoor unit, the temperature of water decreases and it releases heat while the 
refrigerant absorbs heat and evaporates. With the help of wired controller, the outflow temperature can meet the 
user’s requirement. Through the control of valve, the low-temperature water in the system is connected with indoor 
fan coil and underground pipe, and exchanges heat with the indoor air so that the indoor temperature decreases to 
the required range.

 

Heating: 

in  heating  mode,  the  refrigerant  evaporates  in  the  outdoor  unit  and  is  condensed  in  the  indoor  unit. 

Via the heat exchange with water in the indoor unit, the water absorbs heat and its temperature increases while the 
refrigerant releases heat and is condensed. With the help of wired controller, the outflow temperature can meet the 
user’s requirement. Through the control of valve, the high-temperature water in the system is connected with indoor 
fan coil and underground pipe, and exchanges heat with the indoor air so that the indoor temperature increases to 
the required range.

 

Water  heating: 

in  water  heating  mode:  the  refrigerant  evaporates  in  the  outdoor  unit  and  is  condensed  in 

the indoor unit. Via the heat exchange with water in the indoor unit, the water absorbs heat and its temperature 
increase while the refrigerant releases heat and is condensed. With the help of wired controller, the outflow 
temperature  can  meet  the  user’s  requirement. Through  the  control  of  valve,  the  high-temperature  water  in  the 
system is connected with the coil pipe of bearing water tank, and exchanges heat with the water in the water tank 
so that the temperature of water tank increases to the required range.

 

C water heating: 

when cooling mode exists together with the water heating mode, the user can set the 

priority of these two modes based on the needs. The default priority is heat pump. That is under the default setting, 
if cooling mode exists together with the water heating mode, the heat pump gives priority to cooling. In that case, 
water heating can only realized with e-heater of the water tank. Inversely, the heat pump gives priority to water 
heating and switches to cooling after finishing water heating.

 

 water heating: 

when heating mode exists together with the water heating mode, the user can set the 

priority of these two modes based on the needs. The default priority is heat pump. That is under the default setting, 
if heating mode exists together with the water heating mode, the heat pump gives priority to heating. In that case, 
water  heating  can  only  realized  with  e-heater  of  the  water  tank.  Inversely,  the  heat  pump  gives  priority  to  water

 

 

 

 

 

 

 

SPLIT  TYPE 

 

Содержание Versati III GRS-CQ1 OPd/NhG-K

Страница 1: ...rcial air conditioners Please read this Owner s Manual carefully before operation and retain it for future reference If you have lost the Owner s Manual please contact the local agent or visit www gre...

Страница 2: ...and inspection which may impact the normal operation of unit please do not disassemble the unit by yourself You can contact with the special maintenance center of our company if necessary For personal...

Страница 3: ...4 The method of calculating the charging pressure of expansion vessel 18 7 5 Selection of expansion vessel 19 8 Remote Air Temperature Sensor 20 9 Thermostat 21 10 2 Way Valve 21 11 3 Way Valve 22 12...

Страница 4: ......

Страница 5: ...ed service life five hazard or even severe injuries Special air conditions are required for where mentioned above NOTE SPLIT TYPE Air to water Heat Pump Safety Notices Please be sure to abide WARNING...

Страница 6: ...hat on nameplate of unit and capacity of power supply power cord or socket is suitable for input power of this unit Special circuit must be adopted for power supply to prevent fire Do not use octopus...

Страница 7: ...t Earthing the unit must be earthed reliably The earthing wire should connect with special device of buildings If not please ask the qualified personnel to install Furthermore don t connect earth wire...

Страница 8: ...r cause stop of the unit and even fire Keep pressurized spray gas holder and so on away from the unit above 1m It may cause fire or explosion Please note whether the installation stand is firm enough...

Страница 9: ...t Don t directly expose the unit under the corrosive ambient with water or dampness Don t operate the unit without water in water tank The air outlet inlet of unit cannot be blocked by other objects T...

Страница 10: ...ures Item Minimum entering water pressures Maximum entering water pressures Cooling 0 05MPa 0 25MPa Heating Water heating The range of external static pressures at which the appliance was tested add o...

Страница 11: ...or om ressor em em er eur in E nsion esse i ing e oor em er ure e u m o ressure o ressure s ich ro s ich ro coo ing he ign s i ui se r or S imming oor em er ure o s i ch S imming oo re urm em er ure e...

Страница 12: ...alve the high temperature water in the system is connected with indoor fan coil and underground pipe and exchanges heat with the indoor air so that the indoor temperature increases to the required ran...

Страница 13: ...disinfected When starting up the disinfection function and setting corresponding time to meet the requirement of disinfection mode the function will start After the setting temperature is reached this...

Страница 14: ...Capacity Power supply Heating1 kW Heating2 kW GRS CQ4 0Pd NhG K 4 4 220 240VAC 1ph 50Hz GRS CQ6 0Pd NhG K 6 6 GRS CQ8 0Pd NhG K 7 5 7 GRS CQ10Pd NhG K 10 9 GRS CQ12Pd NhG K 12 11 GRS CQ14Pd NhG K 14...

Страница 15: ...ature line Notes a Type of thermostat and specification should be complied with installation of this manual b By pass valve must be installed to secure enough water flow rate and by pass valve should...

Страница 16: ...uld be equipped with internal electric heater to to secure enough heat energy in the very cold days CASE 3 Connecting Sanitary Water Tank Under floor Coil and FCU Shut off value Remote room Thermostat...

Страница 17: ...13 SPLIT TYPE Air to water Heat Pump 5 Main Components 1 GRS CQ4 0Pd NhG K GRS CQ6 0Pd NhG K GRS CQ8 0Pd NhG K...

Страница 18: ...14 Air to water Heat Pump SPLIT TYPE 2 GRS CQ10Pd NhG K GRS CQ12Pd NhG K GRS CQ14Pd NhG K GRS CQ16Pd NhG K GRS CQ10Pd NhG M GRS CQ12Pd NhG M GRS CQ14Pd NhG M GRS CQ16Pd NhG M...

Страница 19: ...n of outdoor unit 6 2 1 Select installation location of outdoor unit 1 Outdoor unit must be installed on a firm and solid support 2 Outdoor unit shall be installed close to the indoor unit hence to mi...

Страница 20: ...GRS CQ14Pd NhG M GRS CQ16Pd NhG M 1207 Description Unit inch No Name Remarks 1 Liquid side Service Valve 3 8 GRS CQ8 0 10Pd NaD K GRS CQ12 14Pd NaD M 2 Gas side Service Valve 5 8 GRS CQ8 0 10Pd NaD K...

Страница 21: ...ng lift To avoid rusting do not knock the metal parts 7 Installation of Indoor Unit 7 1 Select installation location of indoor unit 1 Avoid direct sunshine 2 Ensure the hanger rod ceiling and building...

Страница 22: ...system is lower than the maximum volume required in the above figure If it exceeds the range the expansion vessel does not meet the installing requirement Installation height 1 difference Water volum...

Страница 23: ...lection of expansion vessel Formula V Volume of expansion vessel C Total water volume P1 Pre set pressure of expansion vessel P2 The highest pressure during running of the system that is the action pr...

Страница 24: ...oor is approximately 1 5m c Remote air temperature sensor cannot be located where the area may be hidden when door is open d Remote air temperature sensor cannot be located where external thermal infl...

Страница 25: ...find terminal block XT5 as NO 22 24 and block XT6 as NO 33 34 Otherwise if it is 24V find terminal block XT5 as NO 17 21 3 If it is the heating cooling thermostat please connect wire as per the figur...

Страница 26: ...common 2 Flow A means water flow from the indoor unit to under floor water circuit 3 Flow B means water flow from the indoor unit to sanitary water tank Follow steps below to wire the 3 way valve Foll...

Страница 27: ...other reasons please follow steps below and nominal charged volume on the nameplate Discharging remove metal sheets of the outer casing connect a hose to the charging valve and then discharge refriger...

Страница 28: ...with a siphon tube or not With siphon tube No siphon tube 15 Installation of Insulated Water Tank 15 1 Installation measure The insulated water tank should be installed and keep levelly within 5m and...

Страница 29: ...end of the safety check valve should connect with tap water joint Connect the hot water pipe and water outlet of water tank with PPR pipe Safety check valve Tap water Note For safe use of water water...

Страница 30: ...inal out diameter of dn25 and S2 5 series wall thickness of 4 2mm being recommended Cooling water inlet pipe and hot water outlet pipe of water tank should also be hot water pipe PPR pipe with nominal...

Страница 31: ...lines can t be installed until water heater unit is fixed Do not let dust and other sundries enter into pipeline system during installation of connection pipes d After connection of all waterway pipel...

Страница 32: ...for additional installation If circuit breakers with leakage protection are in use action response time must be less than 0 1 second leakage circuit must be 30mA b The above selected power cable diam...

Страница 33: ...ric magnetic 2 way valve 1 is normally open X28 Electric magnetic 2 way valve 1 is normally closed X29 High power load control X30 High power load control X31 Electric magnetic 3 way valve 1 is normal...

Страница 34: ...on to welding protection for the auxiliary electric heater 1 CN22 Detection to welding protection for the auxiliary electric heater 2 CN23 Detection to welding protection for the water tank electric h...

Страница 35: ...xpansion valve 1 4 pin driving impulse output 5 pin 12V T_SENSOR2 1 2 environment 3 4 discharge 5 6 suction 1 2 hole pipe temperature 3 4 hole environment 5 6 hole exhaust T_SENSOR1 1 2 economizer inl...

Страница 36: ...utput N OUT Neutral line output COMM Communication U To compressor phase U V To compressor phase V W To compressor phase W 2 GRS CQ10Pd NhG K GRS CQ12Pd NhG K GRS CQ14Pd NhG K GRS CQ16Pd NhG K Silk Sc...

Страница 37: ...r pump CN19 Interface to the variable frequency water pump CN15 20K temperature sensor inlet water CN15 20K temperature sensor outlet water CN15 20K temperature sensor refrigerant liquid line CN16 20K...

Страница 38: ...15V 5 pin control signal 6pin feedback signal FA 1 2 3 4 signals 5 power supply to EXV1 pipe electric expansion valve 1 4 pin driving impulse output 5 pin 12V FB 1 2 3 4 signals 5 power supply to EXV2...

Страница 39: ...een Introduction AC L Live line input of the main board N Neutral line of the power supply for the main board L OUT Live line output of the filter board to the drive and main boards N OUT Neutral line...

Страница 40: ...ne 5 L2 1 To PFC inductor yellow line 6 L2 2 To PFC inductor blue line 7 COMP Wiring board 3 pin DT 66BO1W 03 variable frequency 8 COMM Communication interface 1 3 3V 2 TX 3 RX 4 GND 9 DC BUS DC BUS P...

Страница 41: ...wer load control X31 Electric magnetic 3 way valve 1 is normally open reserved X32 Electric magnetic 3 way valve 1 is normally closed reserved X33 Electric magnetic 3 way valve 2 is normally open wate...

Страница 42: ...er 2 CN23 Detection to welding protection for the water tank electric heater CN24 Door guard detection CN25 Flow switch CN26 Reserved CN1 485 112V 4 pin CN2 485 1communiction without12V 4 pin CN3 485...

Страница 43: ...4 pin driving impulse output 5 pin 12V T_SENSOR2 1 2 environment 3 4 discharge 5 6 suction 1 2 hole pipe temperature 3 4 hole environment 5 6 hole exhaust T_SENSOR1 1 2 economizer inlet 3 4 economize...

Страница 44: ...ine L2 F drive board L3 F L3 F power supply output line L3 F drive board L3 F X9 to the grounding line W V U Silk Screen Specification W Connector to the compressor phase W U Connector to the compress...

Страница 45: ...1 28 29 X20 4V YV1 KM3 2 19 20 30 CN23 SW CN25 H PRESS Electric component position map Other thermal N L 21 33 32 SP X23 22 3 CN3 42 CN7 DC MOTOR1 AP2 L XT5 XT4 HEAT 34 L1 AP4 AP3 Therm COOL 24 23 3 5...

Страница 46: ...T2 XT1 Pump Control signal OUT 29 30 40 41 CN19 BN PUMP BU YEGN Earthing wire is available for iron clad motor while unavailable for plastic clad motor PE N L1 L1 L3 L2 12 13 14 15 16 17 18 19 20 21 2...

Страница 47: ...l Coil Coil thermal Gate Pump Control controller signal OUT Air to water Heat Pump 2 GRS CQ10Pd NhG K GRS CQ12Pd NhG K GRS CQ14Pd NhG K GRS CQ16Pd NhG K Terminal board XT3 Terminal board XT4 Terminal...

Страница 48: ...CQ14Pd NhG M GRS CQ16Pd NhG M Terminal board XT3 Terminal board XT4 220VAC Coil KM1 2 220VAC Coil KM2 2 220VAC Coil KM3 2 Other thermal Thermostat Gate controller Pump Control signal OUT Terminal boar...

Страница 49: ...replenishing pipe proper 8 Are the nilometer of water tank water temperature indicator controller manometer pressure relief valve and automatic discharge valve etc installed and operated properly 9 D...

Страница 50: ...ch may damage the unit 4 Apply the universal electric meter to measure the insulation resistance between each outdoor phase and earth as well as between phases Caution defective earthing may cause ele...

Страница 51: ...ase adjust the hydraulics system pressure according to next item If the pressure is less than 0 5 bar please recharge the water immediately When recharging the hydraulics system pressure should be not...

Страница 52: ...GREE ELECTRIC APPLIANCES INC OF ZHUHAI Add West Jinji Rd Qianshan Zhuhai Guangdong China 519070 Tel 86 756 8522218 Fax 86 756 8669426 E mail gree gree com cn www gree com...

Отзывы: