5HPRYDO3URFHGXUH
Step
P
s
rocedure
13. Remove PFC induction
14. Remove 4-way valve assy and suction pipe sub-assy
15. Remove liquid container
PFC induction
4-way valve assy
suction pipe sub-assy
liquid container
Remove the screw connecting the PFC induction
and middle isolation sheet, and then remove the
PFC induction
Unsolder the welding joint connecting the 4-way
valve assy with compressor suction and discharge
port, the valve with the outlet pipe of condenser.
Then lift the 4-way valve assy to remove it.
(NOTE: Discharge the refrigerant completely before
unsoldering.) Unsolder the welding joint connecting
the suction pipe sub-assy with compressor and liquid
container, and then remove the suction pipe sub-assy.
Remove the screws connecting the isolation plate
sub-assy and the liquid container, and then lift the
liquid container to remove it.
Содержание GWHD(18)NK3FO
Страница 1: ...GREE ELECTRIC APPLIANCES INC OF ZHUHAI Service Manual Change for Life 02 1 2 1 2 1 2 1 2 5HIULJHUDQW 5...
Страница 3: ...6XPPDU DQG HDWXUHV 6XPPDU DQG HDWXUHV 2XWGRRU 8QLW 0RGHOV 3URGXFW RGH 1 2 1 2 1 2 1 2...
Страница 8: ...RQVWUXFWLRQ 9LHZV RQVWUXFWLRQ 9LHZV 0RGHO 1 2 8QLW PP 0RGHOV 1 2 1 2 1 2...
Страница 24: ...SORGHG 9LHZV DQG 3DUWV LVW SORGHG 9LHZV DQG 3DUWV LVW 0RGHO 1 2...
Страница 26: ...SORGHG 9LHZV DQG 3DUWV LVW 0RGHO 1 2...
Страница 28: ...SORGHG 9LHZV DQG 3DUWV LVW 0RGHO 1 2...
Страница 30: ...SORGHG 9LHZV DQG 3DUWV LVW 0RGHO 1 2...