Contents
1 Safety Notices (Please be sure to abide) ................................. 1
2 Product Introduction ................................................................. 4
2.1 Nominal Operating Condition ........................................................ 4
2.2 Operating Range ........................................................................... 4
3 Pre-installation Instruction........................................................ 5
3.1 Checking Product Received .......................................................... 5
3.2 Standard Accessory Parts ............................................................. 5
3.3 Before Beginning Installation ........................................................ 5
3.4 Codes & Regulations .................................................................... 5
3.5 Replacement Parts ........................................................................ 5
4 Installation Instructions ............................................................ 6
4.1 Physical Dimension ....................................................................... 6
4.2 General Information ...................................................................... 8
4.3 Location ........................................................................................ 8
4.4 Crane Way .................................................................................... 9
4.5 Installation Positions and Clearances ........................................... 9
4.6 Installation of Condensate Pipe................................................... 11
5 Electrical Installation .............................................................. 12
5.1 Electrical Date and Wire Sizing ................................................... 14
5.2 Connect Wiring to the Terminals ................................................. 14
5.3 Electrical Connections-Supply Voltage ........................................ 16
5.4 Wiring Diagram ........................................................................... 17
6 Maintenance .......................................................................... 17
7 Trial Run ................................................................................ 18
8 Troubleshooting ..................................................................... 19
9 Unit Function .......................................................................... 20
9.1 Setting of Double Indoor Room Sensors ..................................... 20
9.2 Checking of Outdoor Ambient Temperature ................................ 20
10 Error Code Meaning ............................................................ 20
Содержание GK-H03NH3AS
Страница 28: ......