MAINTENANCE MANUAL OF GW4D20/GW4D20B TURBOCHARGED DIESEL ENGINES
246
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
Section VI Cylinder Cover
Fig. 5-6-1 Installation and removal procedures of cylinder cover
Removal procedure
①
Injector harness connector
②
Fuel return hose component
③
Fuel inlet pipe of fuel injector
④
Crankcase vent hose
subassembly
⑤
Water outlet pipe connecting
pipe component
⑥
Vacuum control valve (VGT
turbocharger)
⑦
Water return pipe
component of heater
⑧
Camshaft position
sensor
⑨
Oil filler cover
⑩
Cylinder cover
○
11
Cylinder cover packing
Installation procedure
Install them in the
opposite order of
removal.